The supply air opening must not be closed or restricted
The connection nozzle for the combustion air at the top of the device
must be accessible for the chimney sweep
The following control checks himself that he has to perform himself:
Pressure check on the manometer
Check of the receiver under the blowpipe of the safety valve
Only an approved heating specialist may carry out the inspection and
cleaning work at intervals.
7.5.2
Documents
The documents belonging to the heating plant must be handed over to
the customer with the instruction that they have to be kept in the boiler
installation room.
System log with checklist for commissioning with confirmation and
legally binding signature handed to the customer: Only components
tested and marked according to the respective standard have been
used. All components have been installed according to the
manufacturer's instruction. The whole system conforms to the standard.