![Porsche 911 GT3 R 2012 Скачать руководство пользователя страница 69](http://html1.mh-extra.com/html/porsche/911-gt3-r-2012/911-gt3-r-2012_technical-manual_1580132069.webp)
66
5.8.5.
Gearbox maintenance
The following work should be carried out regularly:
•
Check gear ratio teeth, dogs and dog-rings
•
Check the shift collars
•
Check the gear hub and gear roller bearings for signs of wear
and pitting
•
Check the oil for signs of metallic debris
The following work should be carried out after a total running time of
approximately 30 hours:
•
Check the crown wheel and pinion for pitting
•
Replace the pinion bearing ( 4-point bearing)
•
Replace the oil filter
•
Replace the shift cable
•
Replace differential housing
The gearbox mount shall be replaced at a maximum running time of 50
hrs.
Содержание 911 GT3 R 2012
Страница 1: ...Technical Manual Model 2013...
Страница 10: ...7 3 3 Engine power and torque curves...
Страница 92: ...89 6 3 2 4 Trailing arm 16 mm spacer 16 mm spacer...
Страница 99: ...96 6 5 4 Suspension stut front Position Dimension Tightening Torque Nm 9 M6 x 12 10 12 M8 75 13 M14 40 16 M8 35...
Страница 106: ...103 6 5 11 Suspension strut rear Position Dimension Tightening Torque Nm 3 upper M12 x 1 35 3 lower M12 x 1 40 15 M10 46...
Страница 121: ...118 9 2 Exterior 9 2 1 Front bumper...
Страница 122: ...119 9 3 Rear wing engine cover Gurney 10mm P1 P12...
Страница 157: ...154 10 13 Relay and fuse assignment 10 13 1 Fuse holder...
Страница 159: ...156 10 13 4 MS4 sensor system...