![POLIURS CV4.04 Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/poliurs/cv4-04/cv4-04_montage-instructions_1574149039.webp)
HEATING MAIN MONTAGE INSTRUCTIONS CV4.04
Addition Nr 4
SECURITY ALARM STATEMENT OF ACCEPTANCE
Prepared: 20___. “_____” ________________ , ________________________________
place
Site address:____________________________________________________________
Track/section identification:__________________________________________________
_________________________________________________and length:________meters.
Parameter
Preheated flow pipe
Return pipe
Norm
Actual
Compliance Norm
Actual
Compliance
Alarm wire loop
resistance,
Ω
i
Insulation
resistance, k
Ω
≥
200
≥
200
Conclusion:
_______________________________________________________________
________________________________________________________________________
________________________________________________________________________
Tests performed:
_____________________________________________________ _________________
Company, position, name, surname
Signature
_____________________________________________________ _________________
Company, position, name, surname
Signature
_____________________________________________________ _________________
Company, position, name, surname
Signature
Alarm system accepted:
_____________________________________________________ _________________
Company, position, name, surname
Signature
Notes: 1.Statement should be filled during track montage and is mandatory to keep all the warranty period.
2. “POLIURS” Ltd. warranty on alarm system wires is effective, if customer filled out and kept alarm
system montage testing act and alarm system acceptance act following this example.
3. Alarm wire loop resistance is calculated according to this formula: R= (0,013 x L) ± 15%,
where – R- resistance (ohm); L- alarm wire loop length (meters).
Example: section length 200 m, loop = 400 m, norm resistance R=5,2 ± 0,8 ohm.
Calculations: