![POLIURS CV4.04 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/poliurs/cv4-04/cv4-04_montage-instructions_1574149023.webp)
HEATING MAIN MONTAGE INSTRUCTIONS CV4.04
4. Place sleeve above the connection and
symmetrically to PE pipe ends on to the
tape. Remove sleeve protective film.
5. Drill a hole in PE casing at the distance of
Ø25 mm ~50 mm from end of insulation.
6. Drill another hole in PE casing (for air
release) at the distance of Ø 3 mm ~50
mm from the other side of end insulation.
7. Wrap around the pipe and sleeve with
heating insulated tape areas that are not
supposed to be heated up. With weak
yellow part of the flame make sure
sleeve sits down on the PE casing. At
first heat up equally around the
circumference for about 1-2 minutes one
sleeve end. Repeat the same procedure
at the other end of the sleeve until PE is
completely tight against PE pipe casing.
Sleeve montage is performed well, if:
- sleeve ends are densely attached to the
PE pipe casing;
- can’t see any air openings.
8. Perform heat-shrinkable tape montage with accordance to connection montage Type
1, steps 5 – 10.
9. Perform sleeve filling with PUR foam component according to connection montage
Type 1, step 11.
8.2.2.