5
2.2. Dismantling of Transport Beams and Machine Alignment
Lift the machine with a pallet truck/crane (The machine ARG 400 PLUS
S.A.F. may be transported and lifted only with a fork lift truck. USING A
CRANE IS NOT PERMITTED!) and install it exactly on the required wor-
king site. Unscrew the bolts holding the machine and the transport beams,
removing the supporting plates. When using the crane, lift the machine,
remove the beams and lower the machine to the floor. When using the pal-
let truck, proceed as follows: There are channels with M24 nuts welded on
in the corners of the machine base. Screw in the four M24 x 150 bolts sup-
plied with the unit until they touch the floor, and remove the pallet truck
and the transport beams. Keep the machine balance so that it does not over-
balance to any side.
Do not lower the machine with the pallet truck on
the bolts. This could cause the bending of the bolts.
Loosening the bolts
step by step, lower the machine to the floor. Align the machine with sup-
port plates under channels and anchor in the floor, if necessary. Remove the
bolts M24 x 150. Remove rust protection and dust from the sliding surfa-
ces and apply oil again. Ensure electrical connection (see item 2.4.). Check
if the coolant tank fits to the discharge pipe of the machine base. Fill the
machine tray with coolant (approx. 35 litres); the coolant will slowly flow
to the container in the base.
Hazards due to dangerous substances cannot be excluded while coo-
lants are handled. Be sure to observe in your own interest the natio-
nal regulations and recommendations /operating instructions of the manu-
facturer and/or your company concerning safe handling of coolants.
2.3. Machine Installation
The machine must be protected against humidity, rain and dust!
The machine may be operated in the ambient temperatures b 5°C
and + 40°C. The average air temperature must not 35°C over the
period of 24 hours. In temperatures lower than +5°C, the conventional coo-
lants should be replaced with coolants designed for particular temperatu-
res.
2.4. Connection to Energy Supplies
This kind of work may be carried out only by electrically
qualified persons!
Make sure that the network voltage, the voltage protection and the AC-side
voltage comply with the requirements concerning power given in item 3.
Technical Data. If current protection is installed, it must have the S cha-
racteristic (for a frequency converter). When connecting the machine to the
mains 3NPe 50Hz, 400V, TN-S,
consequently follow the colour marking
of the conductors:
L1 black, L2 brown, N blue, PE yellow/green.
Incorrect connection of the zero conductor or PE conductor can cause
damage to electric equipment of the machine or electrical shock!
The
feeder cable of electric power of the machine should be connected to a 16
A protected socket; in case of the direct connection to the line, the lead
must be provided with a lockable master switch. If the motor rotates in
incorrect direction, interchange the conductors L1 black and L2 brown on
the machine lead.
Failure to follow the a.-m instructions causes the band saw drive,
cleaning brush and the coolant pump run in incorrect direction.
The machine could be damaged!
Содержание 20875-0204
Страница 5: ...4 ARG 380 Plus S A F ARG 500 Plus S A F...
Страница 35: ...34 ARG 380 Plus S A F ARG 500 Plus S A F...
Страница 65: ...64 ARG 380 Plus S A F ARG 500 Plus S A F...
Страница 92: ...91...
Страница 93: ...92...
Страница 94: ...93...
Страница 95: ...94...
Страница 96: ...95...
Страница 97: ...96...
Страница 98: ...97...
Страница 99: ...98...
Страница 100: ...99...
Страница 101: ...100...
Страница 102: ...101...
Страница 103: ...102...
Страница 104: ...103...
Страница 105: ...104...
Страница 106: ...105...
Страница 107: ...106...
Страница 108: ...107...
Страница 109: ...108...
Страница 110: ......