Page 4.7
6-CHANNEL BATTERY SIMULATOR MODULE 41-752
pickering
SECTION 4 - PROGRAMMING GUIDE
USING THE SOFT FRONT PANEL
Getting Started
Run the Pickering Interfaces Multiple Battery Simulator SFP by double-clicking the icon in the application folder. The
Multiple Battery Simulator SFP starts up (while loading, the initial window appears, see Figure 4.1) and you should
see a display similar to Figure 4.2.
Figure 4.1 - Loading window of the Pickering Interfaces Multiple Battery Simulator SFP
Figure 4.2 - Initial screen of the SFP after startup
After the application has started,
LXI
is the default selection (Figure 4.3). You can also choose
Demo
(see Demo
section) or
PXI
(see PXI section) or leave
LXI
selected and continue to work with an LXI device. (see LXI section).
Figure 4.3 - Main controls of the SFP after startup