78 . TGA 8000 Installation and Hardware Guide
Setting up the Chiller (refer to Circulator User Manual
for more details)
1.
Fill the reservoir with coolant.
2.
Ensure that the cooling coils are completely covered. The maximum coolant level is
25 mm below the top of the reservoir.
3.
Switch the chiller on at the mains supply and at the switch on the rear of the control
unit (NOT using the Power switch on the front of the control unit).
4.
When switching on the chiller for the first time, select the display language by rotating
the Select/Set control on the front panel, and then pressing to select the desired
option.
5.
The chiller controller will continue with its start-up sequence and then display
"Standby" when ready.
6.
Set the safety set temperature on the controller using a flat screwdriver to rotate the
control to the maximum temperature to which the bath should be heated.
7.
Press the Power switch on the front panel.
8.
The pump will begin operating.
Содержание TGA 8000
Страница 1: ...TGA 8000 Installation and Hardware Guide THERMAL ANALYSIS...
Страница 5: ...5 Safety and Regulatory Information...
Страница 19: ...19 Prepare the Laboratory...
Страница 25: ...25 Installing the TGA 8000...
Страница 55: ...55 TGA 8000 Hardware Maintenance...
Страница 68: ...68 TGA 8000 Installation and Hardware Guide...
Страница 85: ...85 TGA 8000 Autosampler...