
Clarus 500 GC Installation Guide
53
Install the Autosampler Tower Cover
Install the autosampler tower cover by referring to Figures 4 and 5 as you follow this
procedure:
1.
The tower is shipped with two 3/8-in. long screws installed on the bottom of the
tower frame. Loosen but do not remove these screws.
2.
Open the cover door and carefully lower the cover onto the tower, aligning the two
guides inside the cover with the sides of the tower (see Figure 5).
3.
Pull the sides of the cover away from the tower frame just enough to slide the
cover tabs onto the two screws.
4.
Tighten the two screws. Verify that the cover door opens and closes freely and that
it locks when closed. If not, realign the cover until the door locks when closed.
NOTE
:
If the door is hitting the door sensor, loosen the two screws that secure the door sensor
bracket to the tower, then adjust the sensor up or down until the door no longer hits the
sensor (see Figure 4).
Figure 4. Adjusting the position of the tower door sensor.
Содержание clarus 500 gc
Страница 1: ...Clarus 500 GC Installation Guide ...
Страница 5: ...Introduction 1 ...
Страница 6: ......
Страница 11: ...Clarus 500 GC Installation Guide 11 Warning risk of electric shock Warning refer to accompanying documents ...
Страница 12: ...Introduction 12 Label locations on instrument ...
Страница 13: ...Safety Practices 2 ...
Страница 14: ......
Страница 33: ...Preparing Your Laboratory 3 ...
Страница 34: ......
Страница 43: ...Clarus 500 GC Installation Guide 43 Sample Preparation Requirements Customer Responsibility ...
Страница 45: ...Installing the Clarus 500 GC 4 ...
Страница 46: ......
Страница 58: ...Installing the Clarus 500 GC 58 ...
Страница 59: ...Connecting the Gases and Electrical Supply 5 ...
Страница 60: ......
Страница 67: ...Clarus 500 GC Installation Guide 67 Figure 12 Location of the Clarus 500 GC bulkheads on the rear panel ...
Страница 71: ...Clarus 500 GC Installation Guide 71 Figure 13 TCD in Channel B rear channel with one packed injector ...
Страница 79: ...Clarus 500 GC Installation Guide 79 Figure 21 ECD in Channel A PID ElCD in Channel B with two packed injectors ...
Страница 82: ...Connecting the Gases and Electrical Supply 82 Figure 22 Connecting the CO2 or LN2 supply ...
Страница 84: ...Connecting the Gases and Electrical Supply 84 Table 2 Plugs Used in Different Countries ...
Страница 88: ...Connecting the Gases and Electrical Supply 88 ...
Страница 89: ...Connecting the Accessories 6 ...
Страница 90: ......
Страница 92: ...Connecting the Accessories 92 Figure 24 ElCD Control Unit front panel ...
Страница 105: ...Clarus 500 GC Installation Guide 105 Figure 34 Routing recorder integrator wires around the strain relief posts ...
Страница 106: ...Connecting the Accessories 106 ...
Страница 107: ...PPC Restrictor Information 7 ...
Страница 108: ......