
Preparing Your Laboratory
36
Preparing the Laboratory
The following sections describe the laboratory requirements in detail for the Clarus 500 GC.
Environmental Conditions
The laboratory in which the Clarus 500 GC is located must meet the following conditions:
•
A corrosive-free environment.
•
The instrument will operate with a laboratory temperature between 10 and 35 °C (50- 95
°F). For optimum instrument preformance, the room temperature should be controlled at
20°
±
2 °C.
•
The environment should be relatively dust-free to avoid sample and instrument
contamination problems.
•
Free of excessive vibration.
The Clarus 500 GC has
been designed for indoor use. Do not use the instrument in an area
where explosion hazards may exist.
Exhaust Vent Requirements
Exhaust venting is important for the following reasons.
•
It protects laboratory personnel from toxic vapors that may be produced by some
samples.
•
It helps to protect the instrument from corrosive vapors that may originate from the
sample(s).
•
It removes dissipated heat produced by the instrument and power supply.
Содержание clarus 500 gc
Страница 1: ...Clarus 500 GC Installation Guide ...
Страница 5: ...Introduction 1 ...
Страница 6: ......
Страница 11: ...Clarus 500 GC Installation Guide 11 Warning risk of electric shock Warning refer to accompanying documents ...
Страница 12: ...Introduction 12 Label locations on instrument ...
Страница 13: ...Safety Practices 2 ...
Страница 14: ......
Страница 33: ...Preparing Your Laboratory 3 ...
Страница 34: ......
Страница 43: ...Clarus 500 GC Installation Guide 43 Sample Preparation Requirements Customer Responsibility ...
Страница 45: ...Installing the Clarus 500 GC 4 ...
Страница 46: ......
Страница 58: ...Installing the Clarus 500 GC 58 ...
Страница 59: ...Connecting the Gases and Electrical Supply 5 ...
Страница 60: ......
Страница 67: ...Clarus 500 GC Installation Guide 67 Figure 12 Location of the Clarus 500 GC bulkheads on the rear panel ...
Страница 71: ...Clarus 500 GC Installation Guide 71 Figure 13 TCD in Channel B rear channel with one packed injector ...
Страница 79: ...Clarus 500 GC Installation Guide 79 Figure 21 ECD in Channel A PID ElCD in Channel B with two packed injectors ...
Страница 82: ...Connecting the Gases and Electrical Supply 82 Figure 22 Connecting the CO2 or LN2 supply ...
Страница 84: ...Connecting the Gases and Electrical Supply 84 Table 2 Plugs Used in Different Countries ...
Страница 88: ...Connecting the Gases and Electrical Supply 88 ...
Страница 89: ...Connecting the Accessories 6 ...
Страница 90: ......
Страница 92: ...Connecting the Accessories 92 Figure 24 ElCD Control Unit front panel ...
Страница 105: ...Clarus 500 GC Installation Guide 105 Figure 34 Routing recorder integrator wires around the strain relief posts ...
Страница 106: ...Connecting the Accessories 106 ...
Страница 107: ...PPC Restrictor Information 7 ...
Страница 108: ......