Clarus 500 GC Installation Guide
49
Install the Autosampler Tower
Perform the following procedure to install the autosampler tower:
1.
The autosampler tower mounting hardware is shipped already secured to the Clarus
500 GC top. Remove the three screws and flat washers securing the mounting
hardware and use them to secure the tower base to the Clarus 500 GC.
2.
Position the tower interface harness through the autosampler stop, which is part of the
tower base. The harness should be fitted carefully into the hole in the autosampler
base assembly (see Note below).
NOTE: You may find it easier to feed the wires a few at a time. The two yellow tie wraps on this
harness indicate the portion of the harness that needs to be fed to the tower. Only one yellow
tie wrap should be visible at the autosampler stop.
3.
Install the autosampler tower on the top of the Clarus 500 GC as shown in Figure 1.
The locating pin on the Clarus 500 GC fits into the slotted hole in the autosampler
tower base.
Содержание clarus 500 gc
Страница 1: ...Clarus 500 GC Installation Guide ...
Страница 5: ...Introduction 1 ...
Страница 6: ......
Страница 11: ...Clarus 500 GC Installation Guide 11 Warning risk of electric shock Warning refer to accompanying documents ...
Страница 12: ...Introduction 12 Label locations on instrument ...
Страница 13: ...Safety Practices 2 ...
Страница 14: ......
Страница 33: ...Preparing Your Laboratory 3 ...
Страница 34: ......
Страница 43: ...Clarus 500 GC Installation Guide 43 Sample Preparation Requirements Customer Responsibility ...
Страница 45: ...Installing the Clarus 500 GC 4 ...
Страница 46: ......
Страница 58: ...Installing the Clarus 500 GC 58 ...
Страница 59: ...Connecting the Gases and Electrical Supply 5 ...
Страница 60: ......
Страница 67: ...Clarus 500 GC Installation Guide 67 Figure 12 Location of the Clarus 500 GC bulkheads on the rear panel ...
Страница 71: ...Clarus 500 GC Installation Guide 71 Figure 13 TCD in Channel B rear channel with one packed injector ...
Страница 79: ...Clarus 500 GC Installation Guide 79 Figure 21 ECD in Channel A PID ElCD in Channel B with two packed injectors ...
Страница 82: ...Connecting the Gases and Electrical Supply 82 Figure 22 Connecting the CO2 or LN2 supply ...
Страница 84: ...Connecting the Gases and Electrical Supply 84 Table 2 Plugs Used in Different Countries ...
Страница 88: ...Connecting the Gases and Electrical Supply 88 ...
Страница 89: ...Connecting the Accessories 6 ...
Страница 90: ......
Страница 92: ...Connecting the Accessories 92 Figure 24 ElCD Control Unit front panel ...
Страница 105: ...Clarus 500 GC Installation Guide 105 Figure 34 Routing recorder integrator wires around the strain relief posts ...
Страница 106: ...Connecting the Accessories 106 ...
Страница 107: ...PPC Restrictor Information 7 ...
Страница 108: ......