
30
RCS Climbing Device and Hydraulics
Assembly Instructions
Part D Operations
D2.2 Hose arrangement for self-
climbing procedure of the last
unit
For each climbing section, move the last
unit to be climbed separately. Adapt con-
trol sequence as the hydraulic pump is
climbed at the same time. Two cylinders
are in use on one climbing unit.
Do not connect Cylinders 3 + 4 to the
hydraulic pump!
Position of the hydraulic pump
with RCS C/CL:
For the climbing procedure place the
hydraulic pump on the intermediate
platform of the stationary climbing unit.
The hydraulic pump is climbed at the
same time. In this case, the operator is
on the platform.
with RCS P:
Place the hydraulic pump for the
climbing procedure on the building slab.
Move the hydraulic pump with the crane.
D2 Installing the Climbing Device
Fig. 27: Hydraulic diagram for climbing with
the last unit with RCS C/CL
Cylinder 1
Cylinder 2
A1
A2
B1
B2
Hose 10 m
Hose 10 m
Intermediate platform
Hydraulic Pump
A1
B1
A2
B2
A1
B1
A2
B2
1 3
2 4