TTR-07.1 Electromechanical Tripod Turnstile
Figure 10. Floor anchor position and cable entries for housing installation
(turnstile housing is dotted)
5. Remove the cover with LED indication display (2) in the following way:
unscrew the central bolt of the cover with LED indication display (2), located
beneath the hub
(3);
pull the bolt out of the turnstile housing hole;
remove the cover with LED indication display (2) by lifting the cover by its rear
edge in the LED indication display direction and taking it out of the hooks;
carefully disconnect the indication board cable header from the CLB
X1
connector
and place the cover with light display
(2) on the level steady surface.
6. Install the hub (3) and the barrier arms (5) in the following order:
Insert the hub into a corresponding mounting face on the turnstile mechanism shaft.
Caution
!
For proper hub installation before the final tightening of the bolts, barrier arm is to be
shifted into a horizontal position and a 90º degree angle in the horizontal between
the barrier arm and the turnstile housing is to be set with a set square.
Fix the hub with hub fastening bolts (4), inserting a split washer under each bolt
head. Bolts’ tightening is to provide solid hub fixation regarding the turnstile
mechanism shaft (without gaps and mismatches).
7. Connect the power cable
(8) from the turnstile power supply
(7) to the CLB “
XT3
”
connector block. Connect the RC panel
(11) cable
(12) to the CLB “
XT1.L
” connector block.
Connect all the other devices cables to the corresponding CLB connector blocks.
(See Fig. 4 and 11).