background image

Assembly and Operation Manual  

5.5.3 Control over the turnstile is effected by input of the control signal to the turnstile at 
both control modes. The passage waiting time in the pulse control mode is 5 seconds 
regardless of the control signal length. In the potential control mode the passage waiting 
time equals the length of the control signal. 
5.5.4 The pulse control mode is intended for the turnstile operation from the RC panel, 
WRC or the ACS controller,

 

outputs of which support the pulse control mode. 

Standard control inputs: Unl

ock 

A, 

Stop

 and 

Unlock B

.  

Special control input: 

Fire Alarm

.  

See Table 2 for the turnstile operating modes at this control mode. 
The algorithm of control signals at this mode is stipulated in Appendix A. 
The minimum input signal duration, when the operating mode can be changed, should be 
100 ms. The passage waiting time is 5 sec. and it does not depend on the input signal 
duration. 
See Clause 5.10. for the turnstile operation at special “Fire Alarm” control input. 
5.5.5 The potential control mode is intended for the turnstile operation from the ACS 
controller,

 

outputs of which support the potential control mode

 

(for example,

 

a lock 

controller). 

Standard control inputs: 

Unlock A

 and 

Unlock B

Special control inputs: 

Stop

 and 

Fire Alarm

See Table 2 for the turnstile operating modes at this control mode. 
The algorithm of control signals at this mode is stipulated in Appendix B. 
The minimum input signal duration, when the operating mode can be changed, should be 
100msec. The passage waiting time is equal to the low-level signal duration (the turnstile 
remains open in the set direction if a low-level signal exists at the set direction input by the 
moment of passage).  
At the low-level signal inputting to the

 

Stop

 

input,

 

both directions are locked for the time of 

the signal duration regardless the signal strength at the inputs

 

Unlock

 

A

 

and

 

Unlock

 

B

”. 

At the low-level signal removing from the “

Stop

” input, the directions are set to the control 

mode according to the signal strength at the inputs

 

Unlock

 

A

 

and “

Unlock B

”.  

See Clause 5.10 for the turnstile operation at the special “Fire Alarm” control input.  

5.6  Operation with the RC panel  

5.6.1 When the buttons on the RC panel are pressed (the

 STOP

 button and the two other 

buttons corresponding to the passage direction), the closing of the relevant contact “

Stop

”, 

Unlock A

” or “

Unlock B

” to the contact “

GND

” occurs (i.

е

. forming of the low-level signal 

relatively to the contact “

GND

”). 

5.6.2 Operation logic of the turnstile at the single passage in the 

А

(

В

) direction at the pulse 

control mode: 

5.6.2.1 When the button, corresponding to the 

А

 (

В

) passage direction, is pressed 

on the RC panel,

 

the closing of the contact

 

Unlock

 

A(

В

)”

 

to the contact

 

GND

 

occurs (i.

е

. forming of the low-level signal on the contact “

Unlock A(

В

)” relatively to 

the contact “

GND

”). 

5.6.2.2 The CLB microcontroller processes the incoming command and generates 
the command to the control mechanism, which opens the 

А

 (

В

) passage direction 

(lifts the upper (lower) edge of the key holt). 

12 

Содержание TTR-07.1

Страница 1: ...ASSEMBLY AND OPERATION MANUAL TTR 07 1 Electromechanical Tripod Turnstile with Automatic Anti Panic Arms...

Страница 2: ...Electromechanical Tripod Turnstile with Automatic Anti Panic Arms TTR 07 1 Assembly and Operation Manual...

Страница 3: ...ency unblocking of the turnstile 15 5 11 Operation contingencies and response 15 6 MARKING AND PACKAGING 16 7 SAFETY REQUIREMENTS 16 7 1 Installation safety requirements 16 7 2 Operation safety requir...

Страница 4: ...el WRC wireless remote control CLB control logic board 1 APPLICATION The TTR 07 1 electromechanical tripod turnstile with automatic anti panic folding arms hereinafter the turnstile is designed for ma...

Страница 5: ...rotation force max 3 kgf RC panel cable length1 min 6 6 m Ingress Protection Rating IP41 under EN 60529 Electric shock protection class III IEC 61140 Mean time to failure min 4 000 000 passages Mean...

Страница 6: ...adhesive cable tie mount 3 Technical documentation Certificate 1 Assembly and operation manual 1 Package Box 1 4 2 Optional equipment supplied on request WRC kit includes a receiver and transmitter t...

Страница 7: ...on display 3 hub 4 hub fastening bolts 5 barrier arm 6 AC power cable 7 turnstile power supply 8 turnstile power cable 9 emergency unblocking device Fire Alarm 10 emergency unblocking device cable 11...

Страница 8: ...current minimum 6 A in 5 sec 5 2 Design The design of the turnstile is shown in Fig 2 Numbers in brackets correspond to Fig 2 of this Manual 5 2 1 The turnstile comprises a turnstile housing 1 with s...

Страница 9: ...dard e g the terminal is placed at the backside of the turnstile housing the RC panel orientation towards the turnstile can be changed by exchanging places of the RC wires to the contacts Unlock A and...

Страница 10: ...be connected to the turnstile as follows any device separately in any combination with each other all devices simultaneously in parallel Note At the parallel connection of the above devices to the tur...

Страница 11: ...es indication on the RC panel Led A Led Stop and Led B the signal of hub turning in the corresponding direction PASS and PASS the signal of the turnstile ready for a current command Ready the alarm ou...

Страница 12: ...ntacts PASS A PASS B Ready and Detector are closed voltage is supplied to the relay coil and the Alarm relay contacts are broken voltage is not supplied to the relay coil The CLB relay operation relea...

Страница 13: ...Appendix B The minimum input signal duration when the operating mode can be changed should be 100msec The passage waiting time is equal to the low level signal duration the turnstile remains open in...

Страница 14: ...nel 5 7 3 The WRC operation manual is supplied with that device 5 8 Operation with an ACS controller 5 8 1 In the pulse control mode control over the turnstile with an ACS controller is similar to tha...

Страница 15: ...n accordance with the connection layout Fig 4 and Fig 11 If the Fire Alarm input is not used it is necessary to set a jumper between the contacts Fire Alarm and GND This jumper is preset at the factor...

Страница 16: ...further standard operation 5 11 Operation contingencies and response 5 11 1 The turnstile is capable of providing information on the following operation contingencies unauthorized access passage dela...

Страница 17: ...uirements The installation should be carried out only by the qualified personnel after careful study of this Manual Warning All the cables should be connected up when the power supply is switched off...

Страница 18: ...tion on less steady foundation frame foundation for example to mark the mounting holes according to Fig 10 to control the vertical position of the turnstile during installation to arrange additional e...

Страница 19: ...rrent 6 A for compliance with Chapter 3 turnstile operating voltage 8 4 Installation procedure The following installation procedure complies with given installation recommendations see clause 8 1 1 Un...

Страница 20: ...6 Install the hub 3 and the barrier arms 5 in the following order Insert the hub into a corresponding mounting face on the turnstile mechanism shaft Caution For proper hub installation before the fin...

Страница 21: ...ntinuous signal will sound when the intrusion detector activates To eliminate that sound signal press any button on the RC panel The sound will stop without pressing the button in 5 0 5 sec 14 Set the...

Страница 22: ...TTR 07 1 Electromechanical Tripod Turnstile Figure 11 Connection layout description is given in Table 1 21...

Страница 23: ...arm should be fixed automatically 9 2 Operating modes of the turnstile in pulse control mode See Table 2 for the operating modes set from the RC PANEL and for the corresponding indication Please note...

Страница 24: ...ked in the direction of completed passage 4 Free passage in the set direction open for free passage in the chosen direction Press the STOP button and the button corresponding to the chosen passage dir...

Страница 25: ...ntact corresponding to the set passage direction the turnstile remains open in the set direction 3 Both passage directions are open the turnstile is open for passage in both directions The low levels...

Страница 26: ...e the outer panel Check the power cable serviceability and reliability of its connection to the CLB XT3 connector block The turnstile is not controlled in one of the directions and there is light indi...

Страница 27: ...ation axis Note Avoid the ingress of lubricant on the arm rotation sensor disc and the roller surfaces 5 Check the reliability of the cable connections to the CLB connector blocks ling When the cover...

Страница 28: ...amper holder 21 optical arm rotation sensor 11 TRANSPORTATION AND STORAGE The turnstile in the original package should be transported in closed freight containers or in other closed type cargo transpo...

Страница 29: ...the passage direction B opens either for 5 sec or until the passage has been effected in this direction or until the command Always locked and the status of the passage direction A does not change The...

Страница 30: ...at the contact Unlock A while there is a low level at the contacts Unlock B and Stop or active front is at the contact Unlock B while there is a low level at the contacts Unlock A and Stop or active f...

Страница 31: ...open for passage in the direction There is a low level at the contact Unlock while there is a high level at the contacts Stop and Unlock At this command the direction B opens till the low level signal...

Страница 32: ......

Страница 33: ...PERCo Polytechnicheskaya str 4 block 2 194021 Saint Petersburg Russia Tel 7 812 247 04 64 E mail export perco com support perco com www perco com...

Страница 34: ...www perco com...

Отзывы: