Installation
Commissioning
DK9401A1
www.pelltech.eu
3.7 Commissioning
Prior to the initial start-up of the burner make sure that:
The burner is connected to the boiler
The boiler thermostat is installed and is functioning properly
The feeding auger of the burner is installed and connected to the burner
The smoke duct is connected to the chimney, the dampers for smoke gases are open and there is
sufficient draught. When the burner is operating, the negative pressure inside the furnace must
stay between 5-20 Pa
Sprinkler system is connected and pressure switch connected to safety circuit (chapter 3.3).
Phase and neutral wires in power cable are connected properly.
.....................................
Содержание PV1000agri
Страница 1: ...PV1000agri pellet burner User manual POOLELI DRAFT DK9401A1 ...
Страница 24: ...PV1000agri pellet burner p 23 50 Installation Electrical connections DK9401A1 www pelltech eu ...
Страница 25: ...PV1000agri pellet burner p 24 50 Installation Electrical connections DK9401A1 www pelltech eu ...
Страница 26: ...PV1000agri pellet burner p 25 50 Installation Electrical connections DK9401A1 www pelltech eu ...
Страница 39: ...PV1000agri pellet burner p 38 50 Operation and maintenance Replacing components DK9401A1 www pelltech eu ...