background image

5F

AP & HURRIC

ANESHIELD

PERFORMANCE UPGRADE & HURRIC

ANESHIELD DOORS •

 PERFORMANCE UPGRADE &

 

D. 

Secure the jambs and head of the door.

 Drive #10 x 3-1/2" corrosion resistant wood 

screws through the door frame and shim, into the rough framing. Drive the screws 
until snug but 

DO NOT 

over-tighten the screws. 

DO NOT

 bend or bow the unit frame.

E. 

Drill 13/64" clearance holes through the threshold 

but not into the rough opening, at the locations shown in 
illustration on previous page (5E & 5G). Install # 10 x 3/1-2" 
corrosion resistant wood screws through the threshold into 
the fl oor. For Masonry applications use masonry screws that 
are a minimum size of 3/16" diameter x 3" and pilot drill per 
screw manufacturers’s recommendations.

NOTE: Not required on In-swing Fixed doors.

Out-Swing

SILL

HEAD

Drill 1/8” diameter pilot

holes through the clearance

hole in the frame.

5C

#10 x 3-1/2" 

corrosion resistant wood screw

5D

5G

5E

Installation Clip Method:

F. 

Fasten the door to the opening by driving two #8 x 1-1/4”

 corrosion resistant 

screws into the pre-punched holes in the clips. If the clips are bent and fastened to 
the interior stud/block, install the screws as close to the bend as possible.

Note: DO NOT shim above the door. For masonry openings use two masonry 
screws that are a minimum size of 3/16” x 1-1/2” per clip. Pre-drill the masonry 
per screw manufacturer’s recommendations before attempting to drive the 
screws in.

Frame Screw and Installation Clip Methods: 

 

G. 

Drive #10 x 3-1/2” corrosion resistant wood screws

 through the holes in the 

threshold into the fl oor.

Note: For concrete fl oors, use masonry screws that are a minimum size of 3/16” 
diameter x 3”.

Содержание 818K0100

Страница 1: ...her construction methods multiple units or bow and bay windows may be obtained from Pella Corporation or a local Pella retailer or by visiting http www pella com Building designs construction methods...

Страница 2: ...ers 2 Phillips with 8 shaft and small at blade T20 Torx Wrench Drill Drill bits 13 64 and 1 8 and masonry bit for concrete applications INSTALLATION CLIP OPTION 6 or 8 installation clips 6 x 5 8 corro...

Страница 3: ...Apply sill ashing tape 1 Cut a piece of ashing tape 12 longer than the opening width Apply at the bottom of the opening as shown 1E so it overhangs 1 to the exterior Note The tape is cut 12 longer tha...

Страница 4: ...g tape to the width of the opening Install to the anges of the sill pan and overlap the tape from step 1N by 1 If needed add a second or third piece of ashing tape until the sill pan is covered to the...

Страница 5: ...ons for Performance Upgrade and HurricaneShield product requires additional clip installation or screw installation Clip installation prep is included in Step 2B Screw installation steps are included...

Страница 6: ...of sealant Place the rst bead of sealant 1 2 from the base of the interior sill pan lip This bead should also continue up the corner of the sill pan at each end sealing the vertical joints of the sil...

Страница 7: ...ly open the door s and remove all shipping spacers Note Be sure to remove the spacers from the bottom edge of the door panel Use the construction handle to operate both the active and passive door pan...

Страница 8: ...the open screw hole Make sure the screw passes through the shims and into the structural framing M Check door operation Open and close the door to check for proper operation Make sure the door will l...

Страница 9: ...oximately 8 from the top of the door frame head Insert a 8 x 3 screw provided into the pilot hole making sure it passes through the shim and into the rough opening framing Note This step does not appl...

Страница 10: ...rough opening in the locations shown On hinge jambs clearance hole locations are centered between hinges Hinge Jambs See 5A In Swing diagram upper right Fixed and Lock jambs diagram for placement of t...

Страница 11: ...nufacturers s recommendations NOTE Not required on In swing Fixed doors Out Swing SILL HEAD Drill 1 8 diameter pilot holes through the clearance hole in the frame 5C 10 x 3 1 2 corrosion resistant woo...

Страница 12: ...into the space between the door and the rough opening and apply a 1 deep bead of foam This will allow room for expansion of the foam and will minimize squeeze out Apply sealant across the interior sur...

Страница 13: ...s with window and door materials and voids Limited Warranty For additional information on nishing see the Pella Owner s Manual or go to www pella com EXTERIOR FINISHING Wood doors require painting imm...

Страница 14: ...management of moisture within the wall systems The determination of the suitability of all building components including the use of Pella products as well as the design and installation of ashing and...

Страница 15: ...This page left blank intentionally...

Страница 16: ...This page left blank intentionally...

Отзывы: