background image

YOU WILL NEED TO SUPPLY:

TOOLS REQUIRED:

• Cedar or Impervious shims/spacers (12 to 20)
• 16d galvanized fi nish nails (1/4 lb.)
• #10 x 3-1/4" corrosion resistant wood screws 

(Performance Upgrade and HurricaneShield)

• Masonry screws for concrete applications

(Minimum of 3/16" diameter x 3")

• Closed cell foam backer rod/sealant backer 

(21 to 30 ft.)

• Pella

®

 SmartFlash

 foil backed butyl window and door 

fl ashing tape or equivalent

• High quality exterior grade polyurethane or silicone 

sealant (2 to 3 tubes per door)

• Great  Stuff 

 Window and Door Insulating Foam 

Sealant by the Dow Chemical Company or equivalent 
low pressure polyurethane window and door foam - 
DO NOT use high pressure or latex foams

• Sill Pan (Optional) 

6-5/8" x (Rough Opening Width + 2")

• Pella aluminum sill support or wood blocking
• Interior trim and/or jamb extensions (15 to 40 ft.)
• Aluminum Head Flashing

 

• Tape  measure

• Level

• Square

• Hammer

• Stapler

• Sealant  gun

• Scissors or utility knife

• Tin  snips

• Screwdrivers (#2 Phillips with 

8" shaft and small fl at blade)

• T20  Torx  Wrench

• Drill

• Drill bits 13/64" and 1/8"

and masonry bit for 
concrete applications

INSTALLATION CLIP OPTION:

• 6" or 8" installation clips
• #6 x 5/8" corrosion resistant fl at head wood screws 
• #8 x 1-1/2" corrosion resistant screws or 3/16" x 1-1/2" masonry screw

SEALANT

SEALANT

The performance of any building is dependent upon the design, installation, and workmanship 
of the entire building system. Pella Corporation strongly recommends consulting an 
experienced architect, contractor, or structural engineer prior to installation of Pella products. 

The individual (building owner, architect, contractor, installer and/or consumer) responsible 
for the project must take into account local conditions, building codes, inherent component 
limitations, the effects of aging and weathering on building components, and other design 
issues relevant to each project.

The determination of the suitability of all building components for each project, as well as the 
design and installation of fl ashing and sealing systems, are the responsibility of the building 
owner, architect, contractor, installer and/or consumer.

Содержание 818K0100

Страница 1: ...her construction methods multiple units or bow and bay windows may be obtained from Pella Corporation or a local Pella retailer or by visiting http www pella com Building designs construction methods...

Страница 2: ...ers 2 Phillips with 8 shaft and small at blade T20 Torx Wrench Drill Drill bits 13 64 and 1 8 and masonry bit for concrete applications INSTALLATION CLIP OPTION 6 or 8 installation clips 6 x 5 8 corro...

Страница 3: ...Apply sill ashing tape 1 Cut a piece of ashing tape 12 longer than the opening width Apply at the bottom of the opening as shown 1E so it overhangs 1 to the exterior Note The tape is cut 12 longer tha...

Страница 4: ...g tape to the width of the opening Install to the anges of the sill pan and overlap the tape from step 1N by 1 If needed add a second or third piece of ashing tape until the sill pan is covered to the...

Страница 5: ...ons for Performance Upgrade and HurricaneShield product requires additional clip installation or screw installation Clip installation prep is included in Step 2B Screw installation steps are included...

Страница 6: ...of sealant Place the rst bead of sealant 1 2 from the base of the interior sill pan lip This bead should also continue up the corner of the sill pan at each end sealing the vertical joints of the sil...

Страница 7: ...ly open the door s and remove all shipping spacers Note Be sure to remove the spacers from the bottom edge of the door panel Use the construction handle to operate both the active and passive door pan...

Страница 8: ...the open screw hole Make sure the screw passes through the shims and into the structural framing M Check door operation Open and close the door to check for proper operation Make sure the door will l...

Страница 9: ...oximately 8 from the top of the door frame head Insert a 8 x 3 screw provided into the pilot hole making sure it passes through the shim and into the rough opening framing Note This step does not appl...

Страница 10: ...rough opening in the locations shown On hinge jambs clearance hole locations are centered between hinges Hinge Jambs See 5A In Swing diagram upper right Fixed and Lock jambs diagram for placement of t...

Страница 11: ...nufacturers s recommendations NOTE Not required on In swing Fixed doors Out Swing SILL HEAD Drill 1 8 diameter pilot holes through the clearance hole in the frame 5C 10 x 3 1 2 corrosion resistant woo...

Страница 12: ...into the space between the door and the rough opening and apply a 1 deep bead of foam This will allow room for expansion of the foam and will minimize squeeze out Apply sealant across the interior sur...

Страница 13: ...s with window and door materials and voids Limited Warranty For additional information on nishing see the Pella Owner s Manual or go to www pella com EXTERIOR FINISHING Wood doors require painting imm...

Страница 14: ...management of moisture within the wall systems The determination of the suitability of all building components including the use of Pella products as well as the design and installation of ashing and...

Страница 15: ...This page left blank intentionally...

Страница 16: ...This page left blank intentionally...

Отзывы: