background image

6" 

16" MAX  

O.C. 

16" MAX  

O.C. 

16" MAX  

O.C. 

16" MAX  

O.C. 

6" 

6" 

6" 

6" 

6" 

6" 

6" 

OUT-SWING

 

DOUBLE OPERABLE

6" 

6" 

16"  

MAX.  

O.C. 

5A

6" 

6" 

16"  

MAX.  

O.C. 

5A

5B

5E

16" MAX  

O.C. 

16" MAX  

O.C. 

6" 

6" 

6" 

6" 

IN-SWING AND OUT-SWING

SINGLE FIXED OR OPERABLE

6" 

6" 

16" 

MAX.  

O.C. 

6" 

6" 

16"  

MAX.  

O.C. 

5A

5A

5B

5E

DIAGRAM FOR 

PLACEMENT OF 

FRAME SCREWS &

INSTALLATION CLIPS

5

INSTALL THE PERFORMANCE UPGRADE 
OR HURRICANESHIELD FASTENERS

PERFORMANCE UPGRADE & HURRIC

ANESHIELD DOORS •

  PERFORMANCE UPGRADE

Frame Screw Method:

Note: If installing with installation clips, 
proceed to Step E.

A. 

Jambs:
Out-swing:

 On the room side of the jamb; 

drill and counter-sink 13/64" deep diameter 
clearance holes through the door frame 
only and not into the rough opening in the 
locations shown. (See Out-Swing diagram in 
lower right).

 

In-swing:

 

Open door panels;

 drill and 

counter-sink 13/64" deep diameter clearance 
holes through the door frame only and not 
into the rough opening in the locations shown. 
(On hinge jambs; clearance hole locations are 
centered between hinges).

 

Hinge Jambs:

 See 

(5A) In-Swing diagram 
(upper right). Fixed and 
Lock jambs diagram for 
placement of threshold 
screws and installation 
clips (see out-swing 
diagram in lower right).

5A

5A

Out-Swing

INTERIOR

EXTERIOR

In-Swing

EXTERIOR

EXTERIOR

EXTERIOR

INTERIOR

INTERIOR

INTERIOR

Fixed 

Placement

Vent 

Placement

Fixed 

Placement

Drill 13/64" clearance holes 

through the frame

Drill 13/64" 

clearance holes 

through the frame

Vent 

Placement

B.

  Drill 13/64" deep clearance holes through the door frame head

 only and not into 

the rough opening in the locations shown. 

C. 

Drill 1/8" x 1" deep pilot holes through the clearance holes

 and into the rough 

opening framing in the head, jambs, and threshold of the unit frame.

Note: Be certain to shim between jambs and rough opening at all screw locations.

In-Swing Sill

Out-Swing Sill

Screw 

Location

Out-Swing Sill

In-Swing Sill

6"

16" MAX O.C.

16" MAX O.C.

6"

6"

6"

5A

6"

16" MAX O.C.

16" MAX O.C.

6"

6"

6"

In-Swing

Clearance 

Hole 

Location

Clearance 

Hole 

Location

Clearance 

Hole 

Location

Clearance 

Hole 

Location

Содержание 818K0100

Страница 1: ...her construction methods multiple units or bow and bay windows may be obtained from Pella Corporation or a local Pella retailer or by visiting http www pella com Building designs construction methods...

Страница 2: ...ers 2 Phillips with 8 shaft and small at blade T20 Torx Wrench Drill Drill bits 13 64 and 1 8 and masonry bit for concrete applications INSTALLATION CLIP OPTION 6 or 8 installation clips 6 x 5 8 corro...

Страница 3: ...Apply sill ashing tape 1 Cut a piece of ashing tape 12 longer than the opening width Apply at the bottom of the opening as shown 1E so it overhangs 1 to the exterior Note The tape is cut 12 longer tha...

Страница 4: ...g tape to the width of the opening Install to the anges of the sill pan and overlap the tape from step 1N by 1 If needed add a second or third piece of ashing tape until the sill pan is covered to the...

Страница 5: ...ons for Performance Upgrade and HurricaneShield product requires additional clip installation or screw installation Clip installation prep is included in Step 2B Screw installation steps are included...

Страница 6: ...of sealant Place the rst bead of sealant 1 2 from the base of the interior sill pan lip This bead should also continue up the corner of the sill pan at each end sealing the vertical joints of the sil...

Страница 7: ...ly open the door s and remove all shipping spacers Note Be sure to remove the spacers from the bottom edge of the door panel Use the construction handle to operate both the active and passive door pan...

Страница 8: ...the open screw hole Make sure the screw passes through the shims and into the structural framing M Check door operation Open and close the door to check for proper operation Make sure the door will l...

Страница 9: ...oximately 8 from the top of the door frame head Insert a 8 x 3 screw provided into the pilot hole making sure it passes through the shim and into the rough opening framing Note This step does not appl...

Страница 10: ...rough opening in the locations shown On hinge jambs clearance hole locations are centered between hinges Hinge Jambs See 5A In Swing diagram upper right Fixed and Lock jambs diagram for placement of t...

Страница 11: ...nufacturers s recommendations NOTE Not required on In swing Fixed doors Out Swing SILL HEAD Drill 1 8 diameter pilot holes through the clearance hole in the frame 5C 10 x 3 1 2 corrosion resistant woo...

Страница 12: ...into the space between the door and the rough opening and apply a 1 deep bead of foam This will allow room for expansion of the foam and will minimize squeeze out Apply sealant across the interior sur...

Страница 13: ...s with window and door materials and voids Limited Warranty For additional information on nishing see the Pella Owner s Manual or go to www pella com EXTERIOR FINISHING Wood doors require painting imm...

Страница 14: ...management of moisture within the wall systems The determination of the suitability of all building components including the use of Pella products as well as the design and installation of ashing and...

Страница 15: ...This page left blank intentionally...

Страница 16: ...This page left blank intentionally...

Отзывы: