32
SAFIR 5L
OPERATION AND ATTENDANCE MANUAL
PG 01-31
Table No. 2A
Seq.
No.
Manual
Article
No.
Scope of Work
Flight Preparations
Periodic In
spe
ction
Periodic Check
Pre-flight
Prepar
ati
on
Prepar
ati
on for
the Nex
t Flig
ht
Po
st-flig
ht
Prepar
ati
on
Prelimina
ry
Prepar
ati
on
After 300
APU
actuations
or
After 650
APU
actuations
or
After 1000
APU
actuations
or
After 50
-10
hours of APU
operation
After 100
-20
hours of APU
operation
After 150
-30
hours of APU
operation
9 4.8.2
APU
Function
Check
X
10 4.8.3 APU
Inspection
X
11 4.8.4
Inspection of Fuel Filter from Block of Filter and Servo
(in case of signaling of clogging)
X
12
4.8.5
Inspection of the Return Fuel Filter
X
13 4.8.6
Inspection of the Oil Filter
(in case signaling of Clogging)
X
14
4.8.7
Cleaning of the Oil Tank and Renewal of Filling
X
15
4.8.8
Ignition System Inspection
X
X
16
-
Replacement of the Ignition Plug
X
17 4.8.9
Flush of the Oil Pump Relief Valve
(performed in case of defective function of the device)
18
4.8.10
Check of the Electromagnetic Valve 486611.01
X
19
4.8.11
Check of the Speed Transmitter Slot
X
20 4.8.12
Check of the Overrunning Clutch, Brushes and Commutator of the Electric
Starter
X
21
-
Close the mounting and inspection openings of APU area
X
X
X
X
X
X
X
X