
AIMA-FT5S
Product User Manual
Pacific Broadband Networks
18 July 2014
Page 19 of 62
5 Installation
5.1 Preparatory Work for Installation
Before installing this device, you must ensure that the unit is intact and ready for installation.
Unpack and check the unit: Open the box to check for any damage that may have occurred during
shipment.
If damage is found, please contact a PBN customer support representative.
Necessary equipment and tools for installation:
Table 5-1 Necessary equipment and tools for installation
Tools/Modules
Description
Phillips screwdriver PH1/PH2
For fastening the FT5S module in the AIMA3000
chassis
FT5S Module
The module to install into the AIMA3000 chassis
5.2 Unpacking
Unpack the module. Keep the packaging materials for future transport needs.
Check the package manifest, record the product module type, serial number, purchase date, and any
other relevant information to facilitate later management and maintenance.
Table 5-2 Packing Manifest
No.
Description
Qty
1
FT5S module
1
2
Product User Manual (CD)
1
3
Individual test sheet (Certificate of
Performance)
1