A
A
B
C
C
D
D
S
H
U
C
1
2
0
0
-2
1
5
1
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
D
W
G
N
O
B
SIZE
DWG NO
REV
D
UC1200-215
DRAWN -
CHECKED -
APPROVED -
DRY WT:
DATE -
81.5 lbs
DATE -
DATE -
CUSTOMER -
DIMENSIONAL TOLERANCES - UNLESS OTHERWISE SPECIFIED
UNLESS
OTHERWISE
SPECIFIED
125
CONTRACT NO
SCALE
4
1
OF
WELDMENT
MACHINED
FRACTION
X
.X
.XX
1/32"
1/16"
-
.1"
.01"
4mm
2mm
.25mm
1/8"
1/16"
1/32"
ANGULAR
1
D
BCW
1/9/2019
PK
5/1/2018
PK
5/1/2018
1 : 5
.XXX
.005"
.025mm
PROJECT -
Parker Hannifin Corporation
Filtration Group / Water Purification
2630 E. El Presidio Street
Carson, CA 90810
Contact
Office: 310-608-5600
Fax: 310-608-5692
www.parker.com
WET WT: 140 lbs (63.5 kgs)
UC,1200GPD,220V,1PH,50-60Hz
37 kg
1/32"
THIS DOCUMENT CONTAINS INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO PARKER WATER PURIFICATION ("PARKER"). THIS DOCUMENT IS
FURNISHED ON THE UNDERSTANDING THAT THE DOCUMENT AND THE INFORMATION IT CONTAINS WILL NOT BE COPIED OR DISCLOSED TO OTHERS OR USED
FOR ANY PURPOSE OTHER THAN CONDUCTING BUSINESS WITH PARKER, AND WILL BE RETURNED AND ALL FURTHER USE DISCONTINUED UPON REQUEST BY
PARKER. THE RECIPIENT OF THIS DOCUMENT THROUGH ITS OWN ANALYSIS AND TESTING IS SOLELY RESPONSIBLE FOR MAKING THE FINAL SELECTION OF
THE APPLICABLE SYSTEM AND COMPONENTS AND ASSURING THAT ALL PERFORMANCE, ENDURANCE, MAINTENANCE, SAFETY AND WARNING REQUIREMENTS
OF THE APPLICATION ARE MET. COPYRIGHT PARKER. YEAR OF COPYRIGHT IS FIRST YEAR INDICATED ON THIS DOCUMENT. ALL RIGHTS RESERVED.
PROPRIETARY STATEMENT
2
0
.7
[
5
2
6
]
28.3 [719]
4.9 [124] C.O.G
12.1 [308] C.O.G
1
3
.2
[
3
3
6
]
1
2
.0
[
3
0
4
]
.0
[
0
]
.9
[
2
2
]
1
7
.1
[
4
3
4
]
1
8
.0
[
4
5
7
]
.0 [0]
1.1 [29]
14.4 [365]
15.3 [387]
4X RUBBER MOUNTS
.0
[
0
]
3
.1
[
8
0
]
4
.6
[
1
1
8
]
6
.1
[
1
5
6
]
.0 [0]
1.3 [32]
TIE-1002
REJECT WATER
1/2" PP TUBING
TIE-1001
PRODUCT WATER
1/2" PP TUBING
TIE-1000
FEED WATER
1/2" PP TUBING
PUMP AND MOTOR
25.0 [635]
12.0 [305]
6
.0
[
1
5
2
]
1
2
.0
[
3
0
5
]
1
0
.0
[
2
5
4
]
C
.O
.G
6
.0
[
1
5
2
]
10.8 [274]
1
9
.2
[
4
8
8
]
1
3
.2
[
3
3
6
]
MAINTENANCE
AREA
MAINTENANCE
AREA
REVISION HISTORY
REV
DATE
DESCRIPTION
DESIGNER CHECKED BY APPROVED
D
4/5/2019
UPDATED PS-50 SWITCH AND SURROUNDING
COMPONENTS, ADDED ALL COMPONENT TAGS,
CHANGED "PRV ASSY" TO "FEED WATER INLET
ASSY", REVISED PLUMBING CONNECTIONS
BEHIND EACH FLOW GAUGE
JPD
SY
BB
(1.1 [27])
1.8 [ 46]
TYP.
2.4 [61]
TYP.
REFERENCE TP-0281
AC-20B
AC-20A
MAINTENANCE AREA
M
A
IN
T
E
N
A
N
C
E
A
R
E
A
M
A
IN
T
E
N
A
N
C
E
A
R
E
A
MAINTENANCE AREA
MAINTENANCE AREA
M
A
IN
T
E
N
A
N
C
E
A
R
E
A
M
A
IN
T
E
N
A
N
C
E
A
R
E
A
64.9 [1648]
PI-20
PI-25
FI-50
V40
FI-40
BV-35
P-20
PRV-10
ZK-SUB215
Содержание Sea Recovery ULTROClear Series
Страница 2: ...Intentionally left blank ...
Страница 18: ...Figure 3 4 Major Components Location ...
Страница 31: ...8 0 SYSTEM DRAWINGS AND DIAGRAMS AND PARTS LIST ...