4.0
OPERATION
4.1
LOAD OUT PROCEDURE
1)
Load Carbon / Sediment filters into filter housing. See section 5.2 for
detailed procedure.
2)
Load membrane into pressure vessel. See section 5.3.
4.2
FIRST TIME START- PROCEDURE
1) Check the tightness of all lines and fittings.
2) Place the RO unit's valves and switches in the positions shown in Table
4.0.
ID
Description
Position
BV35
Recirculation Valve
Closed
V40
Concentrate Needle Valve
Full Open
SS1
Main Switch
OFF
Table 4.0 - Valve/Switch Line Up - Initial Start-up
CAUTION
Failure to open the
Concentrate Needle Valve V-40
(which is
required to bleed any entrapped air) can result in hydraulic shock
to the system.
3) Prime the system by turning on the water supply and pressing the SLV-15
Feed Solenoid Valve override button until water is visible in the FM-40
concentrate flow meter. See figure below for location. This should only be
required the first time the system is put into service, or the filters or
membranes have been changed.
CAUTION
Failure to prime the system can damage the P-20 Pump.
4) Switch ON the breaker at the main breaker panel to power up the unit.
5) Confirm
PI-20 Feed Pressure Gauge
is above 34 kPa (5 psi)
.
Содержание Sea Recovery ULTROClear Series
Страница 2: ...Intentionally left blank ...
Страница 18: ...Figure 3 4 Major Components Location ...
Страница 31: ...8 0 SYSTEM DRAWINGS AND DIAGRAMS AND PARTS LIST ...