2.0
PREPARATION FOR USE, INSTALLATION AND
INITIAL ADJUSTMENT
2.1
UNPACKING AND HANDLING
Remove unit from shipping crate and inspect for shipping damage.
CAUTION
Do not allow unit or any components to be exposed to freezing
temperatures. If it is anticipated that the unit may be exposed to
freezing temperature, please contact Parker in advance for
technical assistance.
2.2
LOCATION
The RO unit should be installed in a dry, sheltered location protected from
direct weather. Some type of drainage should be provided beneath the RO
unit to allow standing water to drain when performing maintenance or repair (see
system diagram in Section 9.0 for skid size, interface locations and minimum
maintenance envelope requirements).
Since every installation is unique, the mounting instructions are provided
for guidance only. It is recommended that you use your own discretion as
to the exact method of mounting and placement of any mounting bolts.
1)
Mount the RO unit securely making sure that the isolation mounts are
secure to the base of the unit.
2)
Make the following plumbing connections to the RO unit's piping
interfaces (refer to Section 9.0 for the exact piping interface locations):
a)
Connect the inlet water supply either directly from the Sea
water RO system or Dock water using a flexible connection.
b)
Connect the product flow water discharge using a flexible
connection.
c)
Connect the concentrate flow discharge using a flexible hose
connection to the skid.
Содержание Sea Recovery ULTROClear Series
Страница 2: ...Intentionally left blank ...
Страница 18: ...Figure 3 4 Major Components Location ...
Страница 31: ...8 0 SYSTEM DRAWINGS AND DIAGRAMS AND PARTS LIST ...