7. Monitoring and Troubleshooting
8700-A2-GB20-40
May 2002
7-9
Test Status Messages
The Test Status messages in the following table appear in the right column of the
System and Test Status screen.
For further information on testing, refer to
Chapter 8,
Testing
.
Table 7-3.
Test Status Messages
Test Status Message
Meaning
511 Test Active, Pt
n
A 511 Test and Monitor is active on the DSL Port
n network
interface.
DLB Test Active, Pt
n
A Data Terminal Loopback test is active on Port
n.
Lamp Test Active
The Lamp Test is active, causing the LEDs on the front panel
to light.
LLB Test Active, Pt
n
A network Line Loopback test is active on Port
n.
No Test Active
No tests are currently running.
Remote LLB Dn
Active, Pt
n
A Remote Line Loopback Down command is being sent.
Remote LLB Up
Active, Pt
n
A Remote Line Loopback Up command is being sent.
RLB Test Active, Pt
n
A network Repeater Loopback test is active on Port
n.
Telco LLB Active, Pt
n
A Telco-initiated Line Loopback is active on the specified
DSX-1 port.
Telco PLB Active, Pt
n
A Telco-initiated Payload Loopback is active on the specified
DSX-1 port.
Содержание Hotwire 8779
Страница 22: ...2 Using the Asynchronous Terminal Interface 2 10 May 2002 8700 A2 GB20 40...
Страница 36: ...3 Initial Startup and Configuration 3 14 May 2002 8700 A2 GB20 40...
Страница 44: ...4 Cross Connecting Ports 4 8 May 2002 8700 A2 GB20 40...
Страница 52: ...6 Security 6 6 May 2002 8700 A2 GB20 40...
Страница 96: ...9 Transferring Firmware and Configurations Using TFTP 9 6 May 2002 8700 A2 GB20 40...
Страница 148: ...C Connector Pin Assignments C 4 May 2002 8700 A2 GB20 40...
Страница 150: ...D Technical Specifications D 2 May 2002 8700 A2 GB20 40...
Страница 182: ...Index IN 6 May 2002 8700 A2 GB20 40...