8. Testing
8-10
May 2002
8700-A2-GB20-40
Ending an Active Test
Except for the Remote Send Line Loopback, a test initiated by the user can be
ended by the user with the following methods:
Test Timeout option – Enable the Test Timeout system option so the unit can
automatically terminate tests, and set the Test Duration (min) option to specify
the amount of time that tests can run before the unit terminates the test. The
default is 10 minutes. Refer to
Table A-7, System Options,
in Appendix A,
Configuration Options
.
Command column – Under the Command column on any test screen,
position the cursor at Stop next to the active test and press Enter to stop a
specific test.
Abort All Tests menu selection – Select Abort All Tests from the Test menu
to stop all tests running on all interfaces.
Command
Complete
appears
when all tests on all interfaces have been terminated. Network-initiated
loopbacks cannot be stopped from the Test menu.
An aborted test may continue to run for a few seconds as the Stop command is
sent to the remote end and processed.
Содержание Hotwire 8779
Страница 22: ...2 Using the Asynchronous Terminal Interface 2 10 May 2002 8700 A2 GB20 40...
Страница 36: ...3 Initial Startup and Configuration 3 14 May 2002 8700 A2 GB20 40...
Страница 44: ...4 Cross Connecting Ports 4 8 May 2002 8700 A2 GB20 40...
Страница 52: ...6 Security 6 6 May 2002 8700 A2 GB20 40...
Страница 96: ...9 Transferring Firmware and Configurations Using TFTP 9 6 May 2002 8700 A2 GB20 40...
Страница 148: ...C Connector Pin Assignments C 4 May 2002 8700 A2 GB20 40...
Страница 150: ...D Technical Specifications D 2 May 2002 8700 A2 GB20 40...
Страница 182: ...Index IN 6 May 2002 8700 A2 GB20 40...