7. Monitoring and Troubleshooting
7-8
May 2002
8700-A2-GB20-40
FPGA Failed
The Field Programmable
Gate Array serving all ports
failed.
1. Reset the unit and try again.
2. Call your service
representative for
assistance.
G.703 Failed, Pt 1
The unit failed to loop data on
the G.703 on Port
n.
Memory
Test
n Fail
The unit failed memory data
verification (Test 1) or
memory address verification
(Test 2).
Passed
No errors were detected.
No action is needed.
PLD Failed, Pt
n
An error was detected in a
Programmable Logic Device.
1. Reset the unit and try again.
2. Call your service
representative for
assistance.
TSI CPLD Fail
The Complex Programmable
Logic Device serving the
Timeslot Interchanger failed.
TSI Fail
The Timeslot Interchanger
failed.
Table 7-2.
Self-Test Results Messages (2 of 2)
Message
What Message Indicates
What To Do
Содержание Hotwire 8779
Страница 22: ...2 Using the Asynchronous Terminal Interface 2 10 May 2002 8700 A2 GB20 40...
Страница 36: ...3 Initial Startup and Configuration 3 14 May 2002 8700 A2 GB20 40...
Страница 44: ...4 Cross Connecting Ports 4 8 May 2002 8700 A2 GB20 40...
Страница 52: ...6 Security 6 6 May 2002 8700 A2 GB20 40...
Страница 96: ...9 Transferring Firmware and Configurations Using TFTP 9 6 May 2002 8700 A2 GB20 40...
Страница 148: ...C Connector Pin Assignments C 4 May 2002 8700 A2 GB20 40...
Страница 150: ...D Technical Specifications D 2 May 2002 8700 A2 GB20 40...
Страница 182: ...Index IN 6 May 2002 8700 A2 GB20 40...