3-WAY SYSTEM
Outdoor Unit Repair Procedures
2
- 26
2
10. Compressor
10-2-3. Replacing all compressors in a system
(1) Follow the instructions in “3. Discharging Compressor Oil” and drain the oil from the oil separators in all
outdoor units. Measure the amount of drained oil.
(2) Follow the instructions in “10-3. Removing and Installing Compressors” and replace all compressors in the
system.
(3) Follow the instructions in “6. Checking for Leakage After Repair” and check for leaks at all outdoor units and
in the tubing.
(4) Follow the instructions in “7. Evacuating System” and apply vacuum to all outdoor units and tubing.
(5) Fully close the high- and low-pressure gauge valves on the manifold gauge, then stop the vacuum pump.
(6) Disconnect the manifold gauge from vacuum pump. Connect the manifold gauge to the refrigerant cylinder.
Be especially careful that air does not enter the tubing.
Do not reuse the recovered refrigerant. Use a refrigerant cylinder that contains
unused refrigerant.
(7) Open the valve on the refrigerant cylinder, and open the high-pressure gauge valve on the manifold gauge.
When charging has been completed with an amount of new refrigerant equal to the amount of recovered
refrigerant, or when charging with the same amount of new refrigerant has not been completed but no more
refrigerant will enter the unit, first turn the power OFF at the repaired outdoor unit, then remove the short circuit
at the AP pin (CN102). Then fully open all valves on the suction tube, discharge tube, liquid tube, and balance
tube. However, leave the balance tube fully closed if only a single outdoor unit is installed.
(8) If backup operation was engaged, follow the instructions in “4. Backup Operation” and perform backup
operation recovery.
(9) If charging with an amount of new refrigerant equal to the amount of recovered refrigerant was not possible,
fully close the high-pressure gauge valve on the manifold gauge. Then, while the unit is operating in Cooling
mode, open the low-pressure gauge valve on the manifold gauge and charge with the designated amount of
refrigerant.
When charging with liquid refrigerant, add refrigerant a little at a time in order to
prevent liquid back-flow.
(10)
Fully close the low-pressure gauge valves on the manifold gauge, follow the instructions in “8. Charging
Compressor Oil,” and charge with the necessary amount of oil. Also add an amount of oil that is equivalent to
the amount that was drained from the oil separators.
(11) Remove the manifold gauge.
The connecting port employs a Schrader-type valve. When disconnecting the hose,
pressure will be applied from the refrigerant in the outdoor unit.
(12) Follow the instructions in “10-2-4. Dry core cleaning” and perform dry core cleaning of all outdoor units.
CAUTION
CAUTION
CAUTION
SM830188-00̲3WAY.indb 26
SM830188-00̲3WAY.indb 26
2011/03/01 11:55:58
2011/03/01 11:55:58
Содержание U-10MF1E8
Страница 44: ...MEMO 1 38 SM830188 00 3WAY indb 38 SM830188 00 3WAY indb 38 2011 03 01 11 55 23 2011 03 01 11 55 23...
Страница 98: ...MEMO 3 14 SM830188 00 3WAY indb 14 SM830188 00 3WAY indb 14 2011 03 01 11 56 28 2011 03 01 11 56 28...
Страница 148: ...MEMO 5 32 SM830188 01 3WAY indb 32 SM830188 01 3WAY indb 32 2011 11 15 23 04 33 2011 11 15 23 04 33...
Страница 149: ...201111 SM830188 01 3WAY indb 1 SM830188 01 3WAY indb 1 2011 11 15 23 23 06 2011 11 15 23 23 06...