MECH-57
(Adjustment)
1. Place the reels in the L size position.
2. Push the iron core of M-Stopper Solenoid by
hand.
3. Observe the clearance (A) between Mech.
Chassis and M-Stopper as shown in Figure
2-30-2. And make sure that it is within 1.1 to
1.3mm.
4. If not, loosen the 2 screws (A) as shown in Figure
2-30-1, which fixed M-Stopper Solenoid. And
adjust the position of M-Stopper Solenoid so that
the clearance (A) is within the specification. And
tighten the 2 screws (A) as shown in Figure
2-30-2.
Figure 2-30-2
2-31. T4 Post Position Adjustment
1. Confirm that the hole (B) of T4 connection Gear
match with the hole of T4 post as shown in figure
2-31.
2. Confirm that the portion (C) of T4 connection
Gear and hole (A). Those are located as shown in
figure 2-31.
3. If not, adjust the phase of T4 post following the
above procedure.
Note:
This confirmation should be performed on
unloading condition.
Figure 2-31
Содержание AJSDX900P - 24P DVCPRO 50
Страница 3: ... 3 ...
Страница 4: ... 4 AJ SDX900E ...
Страница 5: ... 5 ...
Страница 7: ... 7 AJ SDX900P ...
Страница 8: ... 8 AJ SDX900E ...
Страница 9: ...FCD0307NTNK96E440E441 ...
Страница 32: ...INF 22 8 Open a target folder and select mem jcf file And click OK 9 Click OK 10 Click Program ...
Страница 156: ...SCHEMATIC DIAGRAMS NOTE BE SURE TO MAKE YOUR ORDERS OF REPLACEMENT PARTS ACCORDING TO PARTS LIST SECTION 7 ...
Страница 279: ...CBA 1 MOTHER P C BOARD VEP89140A FOIL SIDE FOIL SIDE REF LOC P6 C6 P11 A6 P13 A6 ...
Страница 308: ...CBA 30 FRONT SW P C BOARD VEP80C57A FOIL SIDE COMPONENT SIDE REAR JACK P C BOARD VEP80C52A COMPONENT SIDE FOIL SIDE ...
Страница 310: ...CBA 32 MENU SW P C BOARD VEP80C58A FOIL SIDE COMPONENT SIDE ...
Страница 312: ...PRE REC P C BOARD VEP83608A AJ YA903G FOIL SIDE COMPONENT SIDE CBA 34 ...