MECH-40
2-8. Supply Brake Solenoid
Replacement and Adjustment
(Studio VTR only)
(Removal)
1. Disconnect
the
connector (A)
on the
P.C.Board
(A)
. (Please refer item “7. Table of Connector”
about reference number of connector and name
of P.C.Board.)
Click this button , then go to item “7. Table of
Connector”.
2. Unscrew the 2 screws (A) and remove the Supply
Brake Solenoid Base Unit as shown in Figure
2-8-1.
3. Unscrew the 2 screws (B) and remove the supply
Brake Solenoid from Supply Brake Solenoid Base
Unit as shown in Figure 2-8-1.
Figure. 2-8-1
(Installation)
1. Install the new supply Brake Solenoid following
the removal steps in reverse order.
NOTE: Hang on the Brake Arm Spring as shown in
Figure 2-8-1.
2. After installing, perform the position adjustment
as following procedures.
(Adjustment Procedures)
1. Place the reels in the M cassette size position.
2. Observe the clearance (A) between Brake pad
and it’s turntable as shown in Figure 2-8-2. And
make sure that it is within 0.2 to 0.5mm.
3. If not, loosen the 2 screws (A), which fixed supply
and Take Up Brake Solenoid Unit. And adjust the
position of Brake Solenoid Unit by moving arrow
direction so that the clearance (A) is within the
specification. And tighten the 2 screws (A).
4. After adjustment, change the reel position to S
and L cassette size, and confirm that the
clearance (A) is within the specification.
Figure 2-8-2
2-9. Take-up Brake Solenoid
Replacement and Adjustment
(Studio VTR only)
(Removal)
1. Disconnect
the
connector (A)
on the
P.C.Board
(A)
. (Please refer item “7. Table of Connector”
about reference number of connector and name
of P.C.Board.)
Click this button , then go to item “7. Table of
Connector”.
2. Unscrew the 2 screws (A) and remove the Take
Up Brake Solenoid Base Unit as shown in Figure
2-9.
3. Unscrew the 2 screws (B) and remove the Take
Up Brake Solenoid from Take Up Brake Solenoid
Base Unit as shown in Figure 2-9.
Figure 2-9
(Installation)
1. Install the new Take up Brake Solenoid following
the removal steps in reverse order.
Note: Hang on the Take up Brake Spring as shown
in Figure 1-9.
2. After installation, position adjustment should be
performed as follows.
(Adjustment Procedures)
1. Please adjust the position of Take up Brake
Solenoid Unit following the adjustment procedure,
which is described in item “2-8. Supply Brake
Solenoid Replacement and Adjustment”.
SUPPLY BRAKE
SPRING
Содержание AJSDX900P - 24P DVCPRO 50
Страница 3: ... 3 ...
Страница 4: ... 4 AJ SDX900E ...
Страница 5: ... 5 ...
Страница 7: ... 7 AJ SDX900P ...
Страница 8: ... 8 AJ SDX900E ...
Страница 9: ...FCD0307NTNK96E440E441 ...
Страница 32: ...INF 22 8 Open a target folder and select mem jcf file And click OK 9 Click OK 10 Click Program ...
Страница 156: ...SCHEMATIC DIAGRAMS NOTE BE SURE TO MAKE YOUR ORDERS OF REPLACEMENT PARTS ACCORDING TO PARTS LIST SECTION 7 ...
Страница 279: ...CBA 1 MOTHER P C BOARD VEP89140A FOIL SIDE FOIL SIDE REF LOC P6 C6 P11 A6 P13 A6 ...
Страница 308: ...CBA 30 FRONT SW P C BOARD VEP80C57A FOIL SIDE COMPONENT SIDE REAR JACK P C BOARD VEP80C52A COMPONENT SIDE FOIL SIDE ...
Страница 310: ...CBA 32 MENU SW P C BOARD VEP80C58A FOIL SIDE COMPONENT SIDE ...
Страница 312: ...PRE REC P C BOARD VEP83608A AJ YA903G FOIL SIDE COMPONENT SIDE CBA 34 ...