MECH-46
2-19. S1 Post Loading Arm Unit
Replacement & Adjustment
(Removal)
1. Remove the S5 Post Base Unit. (Refer to item
2-17)
2. Remove the Tension Arm Unit. (Refer to item
2-18).
3. Unscrew the screw (A) and remove the S1 Post
from Loading Rail as shown in Figure 2-19.
4. Remove the Cut Washer (B) and remove the S1
Loading Arm Unit as shown in Figure 2-19.
(Installation)
1. Install the new S1 Loading Arm Unit following the
removal steps in reverse order, and then S1 Post
Loading Arm Unit Phase Adjustment should be
performed as follows.
2. After installation, confirm that the S1 Post move
smoothly on the Loading Rail.
3. Tension Arm and Tape path Adjustment should be
performed.
(Adjustment)
Install and adjust so that the Hole (A) is to be parallel
with Hole (B) as shown in Figure 2-19.
Figure 2-19
Содержание AJSDX900P - 24P DVCPRO 50
Страница 3: ... 3 ...
Страница 4: ... 4 AJ SDX900E ...
Страница 5: ... 5 ...
Страница 7: ... 7 AJ SDX900P ...
Страница 8: ... 8 AJ SDX900E ...
Страница 9: ...FCD0307NTNK96E440E441 ...
Страница 32: ...INF 22 8 Open a target folder and select mem jcf file And click OK 9 Click OK 10 Click Program ...
Страница 156: ...SCHEMATIC DIAGRAMS NOTE BE SURE TO MAKE YOUR ORDERS OF REPLACEMENT PARTS ACCORDING TO PARTS LIST SECTION 7 ...
Страница 279: ...CBA 1 MOTHER P C BOARD VEP89140A FOIL SIDE FOIL SIDE REF LOC P6 C6 P11 A6 P13 A6 ...
Страница 308: ...CBA 30 FRONT SW P C BOARD VEP80C57A FOIL SIDE COMPONENT SIDE REAR JACK P C BOARD VEP80C52A COMPONENT SIDE FOIL SIDE ...
Страница 310: ...CBA 32 MENU SW P C BOARD VEP80C58A FOIL SIDE COMPONENT SIDE ...
Страница 312: ...PRE REC P C BOARD VEP83608A AJ YA903G FOIL SIDE COMPONENT SIDE CBA 34 ...