MECH-9
1. For Tilt and Azimuth adjustment, loosen the screw
(G) first and tighten the screw (G) after finish
adjustment. And if need to turn the screw (A) and
(F) too much for adjustment, tighten screw (A), (F)
and (G) alternately.
Figure 1-13-1
2. Perform the Height and X-value adjustment under
the screw (G) tightened completely.
3. Be careful the tape damage at T3 Post, when
adjust tilt of A/C Head. (refer to figure 4-13-1)
Figure 1-13-2
Confirm the screw (A) isn’t loose, before perform A/C
Head Tilt adjustment. The screw (A) should be always
touch to top of A/C Head.
4. When the height of A/C Head is adjusted by the
Nut (B), the screw (H) should be loosen first. And
after height adjustment finished, tighten the screw
(H) lightly.
Figure 1-13-3
5. After finish X value adjustment, hit the portion (L)
lightly and confirm the specification of X-value.
6. Each adjustment of A/C Head should be finished
at the condition of tightening the each adjustment
screw. And hit the portion (L) lightly to release the
distortion of A/C Head plate.
Figure 1-13-4
A/C Head
Lift up portion
Press down
portion
A/C Head
A/C Head
(L)
Содержание AJSDX900P - 24P DVCPRO 50
Страница 3: ... 3 ...
Страница 4: ... 4 AJ SDX900E ...
Страница 5: ... 5 ...
Страница 7: ... 7 AJ SDX900P ...
Страница 8: ... 8 AJ SDX900E ...
Страница 9: ...FCD0307NTNK96E440E441 ...
Страница 32: ...INF 22 8 Open a target folder and select mem jcf file And click OK 9 Click OK 10 Click Program ...
Страница 156: ...SCHEMATIC DIAGRAMS NOTE BE SURE TO MAKE YOUR ORDERS OF REPLACEMENT PARTS ACCORDING TO PARTS LIST SECTION 7 ...
Страница 279: ...CBA 1 MOTHER P C BOARD VEP89140A FOIL SIDE FOIL SIDE REF LOC P6 C6 P11 A6 P13 A6 ...
Страница 308: ...CBA 30 FRONT SW P C BOARD VEP80C57A FOIL SIDE COMPONENT SIDE REAR JACK P C BOARD VEP80C52A COMPONENT SIDE FOIL SIDE ...
Страница 310: ...CBA 32 MENU SW P C BOARD VEP80C58A FOIL SIDE COMPONENT SIDE ...
Страница 312: ...PRE REC P C BOARD VEP83608A AJ YA903G FOIL SIDE COMPONENT SIDE CBA 34 ...