Installation
34
900-0033-01-00 Rev A
For testing or temporary installations:
1.
Run a separate CAT5 from the back of the access port to the Communications HUB.
2.
Plug the CAT5 cable into the back of the MATE2.
3.
Plug the other end of the CAT5 cable into the access port on the front of the interior cover.
4.
Use MATE2 to access system status or change system configuration settings.
5.
Remove the MATE2 from the access port.
6.
Replace the interior front cover (if removed) and exterior front cover (if used).
Figure
23
Temporarily Connecting the MATE2 to the SmartRE
Plugs into front of
Access Port
Plugs into back of
Access Port
Communications
HUB
Содержание SmartRE 2500
Страница 1: ...Installation Manual...
Страница 19: ...Planning 900 0033 01 00 Rev A 17 Dimensions Figure 6 Enclosure Dimensions...
Страница 28: ...Installation 26 900 0033 01 00 Rev A Figure 14 Correct Placement for Vertical Installations...
Страница 29: ...Installation 900 0033 01 00 Rev A 27 Removing the Interior Cover Figure 15 Removing the Interior Cover...
Страница 54: ......
Страница 56: ...Wiring Configurations 54 900 0033 01 00 Rev A This page intentionally left blank...
Страница 64: ...Wiring Configurations 62 900 0033 01 00 Rev A This page intentionally left blank...