Connect a Serial Management Device to the SER MGT Port
Connect a Serial Management Device to the SER MGT
Port
1.
Identify the prerequisite and subsequent installation tasks that you must
perform in conjunction with this task.
“Installation Task Overview” on page 11
.
2.
Configure the serial management device to these parameters:
■
9600 baud
■
8 data bits
■
No parity
■
1 stop bit
■
No handshake
3.
Connect the SER MGT cable from the switch to the serial management device.
4.
If necessary, route the SER MGT cable so that it does not interfere with other
cables, with servicing the switch, or with other systems.
5.
Connect the power cords.
“Connect Power Cords” on page 77
Related Information
■
“Connect the SER MGT Cable” on page 75
■
“Connect Power Cords” on page 77
■
“Power On the Switch” on page 81
■
“Log In to the SP (SER MGT)” on page 82
■
“Assign a Static IP Address to the SP” on page 83
■
“Assign a Static IP Address to the SCP” on page 85
■
“Log In to the SP (Network Management)” on page 86
Connect Power Cords
1.
Identify the prerequisite and subsequent installation tasks that you must
perform in conjunction with this task.
“Installation Task Overview” on page 11
.
2.
Ensure that the circuit breakers for the facility power receptacle or power
distribution device are switched off.
Powering On the Switch
77
Содержание Fabric Interconnect F2-12
Страница 1: ...Oracle Fabric Interconnect F2 12 Installation Guide Part No E74400 01 November 2016...
Страница 2: ......
Страница 8: ...8 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Страница 10: ...10 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Страница 22: ...22 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Страница 88: ...88 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Страница 118: ...118 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...