Front Panel Components
■
If you configure the 2 4x IB/40GbE ports for GbE, then the switch can support a maximum
of 50 40GbE ports.
“Rear Panel Components” on page 15
.
Separate, dedicated, and optimized on-board SP, ABD, and SCP manage chassis functionality,
Ethernet traffic, and IB fabric respectively, through user-friendly CLIs and web interfaces.
The virtualization switch ships preconfigured for network management through DHCP.
However, the procedures in this document are serial management focused, with instructions to
configure static IP addresses if desired.
Related Information
■
“Installation Task Overview” on page 11
■
“Front Panel Components” on page 14
■
“Rear Panel Components” on page 15
Front Panel Components
The front panel is the fan and power supply end of the switch. This end of the switch is installed
to the cold aisle.
No.
Description
1
RFID tag
2
Fan modules 0 to 3, starting from the left most fan.
3
Chassis status LEDs
14
Oracle Fabric Interconnect F2-12 Installation Guide • November 2016
Содержание Fabric Interconnect F2-12
Страница 1: ...Oracle Fabric Interconnect F2 12 Installation Guide Part No E74400 01 November 2016...
Страница 2: ......
Страница 8: ...8 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Страница 10: ...10 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Страница 22: ...22 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Страница 88: ...88 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Страница 118: ...118 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...