
Install the Cable Management Comb
Install the Cable Management Comb
1.
Identify the prerequisite and subsequent installation tasks that you must
perform in conjunction with this task.
“Installation Task Overview” on page 11
.
2.
Orient the upper mounting holes of the cable management comb to where you
just installed the 10-32 cage nuts.
3.
Using a No. 2 Philips screwdriver, secure the upper mounting holes of the cable
management comb to the 10-32 cage nuts with two 10-32 screws.
4.
Secure the lower mounting holes of the cable management comb to the hole in
the end center of the shelf rails with two 10-32 screws.
5.
Route the power cords and management cables.
“Route the Power Cords and Management Cables” on page 38
Installing the Switch
37
Содержание Fabric Interconnect F2-12
Страница 1: ...Oracle Fabric Interconnect F2 12 Installation Guide Part No E74400 01 November 2016...
Страница 2: ......
Страница 8: ...8 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Страница 10: ...10 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Страница 22: ...22 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Страница 88: ...88 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Страница 118: ...118 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...