5 Processing for the automatic shutdown of the connected devices
5-2 How to use automatic shutdown software
BL50T/BL75T/BL100T
65
5
2.
Install "PowerAct Pro", "Simple Shutdown Software", or "PowerAttendantLite" to
the PC you want to shut down.
<Installation procedure>
Refer to the "PowerAct Pro "installation guide.
"Simple Shutdown Software" "PowerAttendantLite": Refer to the manual for the
applicable software.
Important notice
Restrictions on the commercial power supply stop time for a schedule action by
automatic shutdown software
・
To perform a schedule action for simultaneously stopping the UPS and the
commercial power supply by using a device such as a circuit breaker, specify a
period of 3 months or shorter (*) for the start of the next operation.
If you specify a period longer than 3 months, the internal timer is reset and the
scheduled operation does not start.
If commercial power is not supplied for more than 3 months, start supplying
commercial power and then press the "Power" switch to start operation. However, if
the battery needs to be replaced then, you may not be able to start operation. In
that case, replace the battery according to "4-2 Replacing the battery".
※
Note that when the battery needs to be replaced, this period is reduced to a half.
To manually start operating the UPS while it is running based on a schedule action set
by automatic shutdown software, or to manually start up the UPS while it is stopped
based on a schedule action, turn off the "Power" switch once, and then turn it on again.
On the contrary, to manually stop the UPS while it is running based on a schedule
action, turn off the "Power" switch.
When "Automatically stop UPS after OS shutdown" is set, if power is restored during
the execution of automatic shutdown processing
・
Even if a power outage occurs and power is restored during the execution of
automatic shutdown processing, the output of the UPS stops once after the set time
elapses.
In that case, do not turn on the computer until the UPS has finished restarting after
power recovery.
References
After the UPS has automatically stopped during a power outage, if recovery is made
from the power outage, the UPS automatically reboots and starts supplying power.
If you do not want to activate the connected devices, either turn off their switches or
disable the automatic start setting for recovery from a power outage ([Settings] - [Boot
Settings] - [Auto Reboot])
Содержание BL100T
Страница 17: ...1 Preparation 1 2 Check the accessories BL50T BL75T BL100T 17...
Страница 21: ...1 Preparation 1 5 I O circuit block diagram BL50T BL75T BL100T 21 1 5 I O circuit block diagram...
Страница 23: ...2 Installation and connection 2 1 Install BL50T BL75T BL100T 23 2 Do not install in any of the following ways...
Страница 73: ...7 How to use optional cards 7 3 SNMP Web card BL50T BL75T BL100T 73 7 7 3 SNMP Web card LAN 10 100...
Страница 80: ...9 References 9 2 Dimensions BL50T BL75T BL100T 80 9 2 Dimensions Unit mm Tolerance 2mm BL50T BL75T BL100T...