
2 Installation and connection
2-3 Connect the AC input
BL50T/BL75T/BL100T
26
2-3 Connect the AC input
When the installation and device connection operation is completed, connect the "AC
input" plug of the UPS into the outlet (commercial power supply).
Caution (for installation and connection)
Be sure to connect the "AC input" plug to a rated input voltage
(100VAC) commercial power supply.
Connecting to a commercial power supply with a different rated voltage
may cause a fire.
The UPS may fail.
For other cautions on connection, refer to "CAUTION (for installation and connection)"
described in "Safety precautions" in the beginning part of this manual.
Connect the "AC input" plug into a 100VAC outlet (commercial power supply).
References
The UPS is shipped after being charged. However, when it is used for the first time,
its backup time may have become shorter due to self-discharge.
We recommend using the UPS after charging.
“3-1-10 Disable screen savers” (P.36) can also be carried out before charging the
battery.
Содержание BL100T
Страница 17: ...1 Preparation 1 2 Check the accessories BL50T BL75T BL100T 17...
Страница 21: ...1 Preparation 1 5 I O circuit block diagram BL50T BL75T BL100T 21 1 5 I O circuit block diagram...
Страница 23: ...2 Installation and connection 2 1 Install BL50T BL75T BL100T 23 2 Do not install in any of the following ways...
Страница 73: ...7 How to use optional cards 7 3 SNMP Web card BL50T BL75T BL100T 73 7 7 3 SNMP Web card LAN 10 100...
Страница 80: ...9 References 9 2 Dimensions BL50T BL75T BL100T 80 9 2 Dimensions Unit mm Tolerance 2mm BL50T BL75T BL100T...