3 Check the operation
3-2 Check the operation
BL50T/BL75T/BL100T
38
7.
Connect the "AC input" plug into the commercial power supply again.
The original status display condition is restored and the buzzer stops sounding
(the state in the following figure arises).
Icon
Description
"Power" switch turned ON
In normal operation
That’s all for the operation check.
Then, the installation and connection processes are all completed.