44
SPECTANO 100 User Manual
3. The reference measurement is running, and the measurement results
are displayed in the graph view.
4. After the first reference measurement has finished, the
Start reference
button
displays the status performed .
5. Click
Start
next to
Reference (2)
.
6. The reference measurement is running, and the measurement results
are displayed in the graph view.
7. After the second reference measurement has finished, the
Start reference
button
displays the status performed .
8. Now, you can start the correction procedure (see chapter 10.4.2
Note:
You can perform the reference measurements before or after the
material measurements.