
GR-750x series
Control panel for addressable emergency
luminaires
Document number: 923750400_09_007
Date: 3/5/2022
Page: 39 of 71
[39]
5.1.4 START DURATION TEST
Menu to start a manual duration test for all zones or a specific one. There is the option to send this command
to all panels of the
panel network
or to the current panel only.
5.1.5 STOP TEST
Menu to stop all running tests on all connected points.
5.1.6 TEST PRINTER
Prints a test page from the thermal printer (if it is available) to verify its proper operation.
5.1.7 TEST INDICATORS
Lights up all front panel LED indicators for about 5 seconds, to verify that all are operational.