
GR-750x series
Control panel for addressable emergency
luminaires
Document number: 923750400_09_007
Date: 3/5/2022
Page: 15 of 71
[15]
3 INSTALLATION
3.1 Installation/Maintance
WARNING
All installation operations must be done while the panel is disconnected from mains
power supply and batteries.
Only trained personnel should carry out operations inside the
panel and only after taking all the precautionary measures.
Prior to installing/maintaining the panel, read the manual and have knowledge of the system capabilities,
functionality, and design to ensure proper operation of system.
Do not connect or disconnect system components while mains power supply or batteries are connected.
Prior to any operation inside the enclosure of the panel, ESD prevention measures should be taken.
Figure 4