Outdoor Living Today www.outdoorlivingtoday.com [email protected]
Page 7
10.
Attach remaining 3 Floor Runners (41 1/2” with straight cut ends and 44” angle cut 1 end) and
57 1/4” with angle cut end as per
Step 8 and 9
. The smaller runners will form a 85 1/2” runner when
connected.
27 3/4”
11.
With Floor Runners attached, carefully flip the floor over and place on your foundation.
Caution:
you will need 2 people to assist you. Be careful when laying floor down not to bend or twist
floor. When in place, level floor completely.
Note:
It is important to note that having a level foundation
is critical. Choosing a foundation will vary between regions. Typical foundations can be concrete pads
or patio stones positioned underneath the floor runners.
Concrete Slab
Foundation
12.
Position
Plywood Floor
pieces
(6) on top of completed floor joists. Push Plywood Floor pieces
together at seams. Plywood will sit slightly recessed from edge of Floor Frame.
27 5/8”
44”
41 1/2”
57 1/4”