Outdoor Living Today www.outdoorlivingtoday.com [email protected]
Page 18
39.
Locate
Front Mid Rafter
(53 1/4” long / 40 degree angle cut on ends). Position on Core Block
90 degrees from other rafters. Attach as per
Step 36
. Remember to drill pilot hole to
prevent splitting and be careful to support all the attached rafters.
41.
Place both 51 7/8” pieces together and attach
with a 24” long Support Cleat with
2 - 2 1/2” Screws.
Flip over and attach a 2nd
Cleat. Screw Plywood Base - 5 1/2” x 5 1/2” to
bottom of Support Beam with
2 - 1 1/2” Screws.
51 7/8”- Support Beam
24” - Support Cleats
40.
Prior to lifting up semi-completed Rafter
Section on to walls, complete assembly of
Temporary Support Beam for Rafters / Core
Block
. The Support Beam when completed will be
104 1/2” high.