Outdoor Living Today www.outdoorlivingtoday.com [email protected]
Page 8
13.
With Plywood positioned correctly on floor framing, attach with
1 1/4” Screws.
Use screws
every 16”. Position middle Plywood Floor pieces (27 5/8” wide) and secure as illustrated above.
14.
Complete remaining Plywood Floor pieces positioning and attaching as per
Step 12 & 13.
B. Wall Section
Exploded view of all parts necessary to complete the Wall Section. Identify all parts prior to
starting.
Rear Wall Top Plate (4)
Corner Post (3)
Window Wall (2)
Narrow Wall (2)
Door Jamb (2)
Front Corner Post (2)
Window
Insert (2)
Solid Wall
Panel (6)
Side Wall Top
Plate (2)
Front Wall Top Plate
Door Header
plywood
pushed together
at seam.