Outdoor Living Today www.outdoorlivingtoday.com [email protected]
Page 6
11
1”
111”
55
1
/2
”
55 1/2”
78
1
/2
”
7.
Place Triangular Floor Section tight against both Rectangular Floor Sections and secure with
6 - 2 1/2” Screws
per side. When Floor Frame Sections are all attached, your perimeter will be
111” x 111” x 55 1/2” x 55 1/2”x 78 1/2”.
8.
Attach
Floor Runners
to completed floor frame perpendicular to the floor joists. There are 8 floor
runners in total. Starting on the 111” side, locate 2 Runners (69 1/2” & 41 1/2” long pieces). Use
9 - 2 1/2” Screws
to secure making sure that the Runner is flush to the outside but not overhanging.
9.
Locate the next 2 Runners (69 1/2” & 41 1/2” long). Alternate Runners so the longer piece is in the
front. Position on center 27 3/4” from outside edge and attach as per
Step 8
. Use
5 - 2 1/2” Screws
per Long Runner and
4 - 2 1/2” Screws
per Short Runner. Place 3rd set of Runners on center Joists.
Short Runner is angle cut on front end. Attach as per
Step 8
.
111”
27 3/4”
Short Runner
angle cut on end