210
LIFELINE AGM BATTERIES
Document No. 6-0101 Rev. F
Page 14 of 40
CHAPTER 5 - COMMISSIONING AND SERVICING INSTRUCTIONS
5.1 Storage
Lifeline® Batteries are charged at the factory before shipment to the distributor. For warranty
coverage, batteries need to be properly boost charged while in storage and installed within 12
months of the original factory ship date. Batteries should be stored in the coolest environment
available, preferably not exceeding 68°F (20°C). The higher the temperature, the faster the
battery will self-discharge and require boost charging. See Appendix C for data on storage time
versus temperature.
While in storage, batteries should be boost charged every 90 days or when the open circuit
voltage (OCV) drops to 12.5 volts for a 12-volt battery (6.25 volts for a 6-volt battery and 2.08
volts for a 2V battery). This OCV corresponds to approximately 75% state of charge. Boost
charge batteries using a constant voltage charger set at 14.4 to 15.0 volts for a 12-volt battery
(7.2 to 7.5 volts for a 6-volt battery and 2.40 to 2.50 for a 2 volt battery). The boost charge
should be applied until the charging current falls below 0.5 percent of the battery’s 20 hour rated
capacity (0.5 amps for a 100 Ah battery).
5.2 Installation
Lifeline® AGM batteries are designed to be installed upright (terminal facing upwards). For
installation in non-upright orientations, contact Concorde for assistance.
Be sure there is adequate ventilation in the area where the batteries are to be installed. Refer to
Section 6.1 for specific safety hazards associated with the emission of hydrogen gas. The space
surrounding adjacent batteries should be at least 0.25 inch to permit airflow around each
battery.
Batteries may be connected in series (voltage adds, capacity stays the same), in parallel
(capacity adds, voltage stays the same), or a combination of series and parallel (both voltage
and capacity add). Each of these connection options are illustrated in Figures 5-1 through 5-3,
respectively. Be sure to torque the terminal bolts to the values given in Section 4.2.
Always use batteries of the same size and condition in multi-battery installations. Connect
batteries using cabling that is sized for the maximum load of the system. The voltage drop on
the cables during charging should not exceed 0.2 volts at full output. Protect the battery
terminals from shorting during installation. When replacing batteries, it is best to replace the
entire set of batteries so they remain balanced.
Содержание LEGACY ELITE 2022
Страница 2: ......
Страница 22: ...22 AUTO DRAIN...
Страница 149: ...149 KEYLESS ENTRY DOOR LOCK...
Страница 162: ...162 Page 11 2017 Nature s Head Inc INSTALLATION Venting NATURE S HEAD COMPOSTING TOILET...
Страница 173: ...173 NATURE S HEAD INC PO Box 250 Van Buren OH 45889 251 295 3043 www NaturesHead net NATURE S HEAD COMPOSTING TOILET...
Страница 204: ...204 LIFELINE AGM BATTERIES 2 2 Battery with Cut Away View...
Страница 205: ...205 LIFELINE AGM BATTERIES 2 3 Terminal Types...
Страница 229: ...229 LIFELINE AGM BATTERIES Document No 6 0101 Rev F Page 33 of 40 Copyright Concorde Battery Corporation 2014...
Страница 230: ...230 LIFELINE AGM BATTERIES Document No 6 0101 Rev F Page 34 of 40 Copyright Concorde Battery Corporation 2014...
Страница 231: ...231 LIFELINE AGM BATTERIES Document No 6 0101 Rev F Page 35 of 40 Copyright Concorde Battery Corporation 2014...
Страница 232: ...232 LIFELINE AGM BATTERIES Document No 6 0101 Rev F Page 36 of 40 Copyright Concorde Battery Corporation 2014...
Страница 233: ...233 LIFELINE AGM BATTERIES Document No 6 0101 Rev F Page 37 of 40 Copyright Concorde Battery Corporation 2014...
Страница 234: ...234 LIFELINE AGM BATTERIES Document No 6 0101 Rev F Page 38 of 40 Copyright Concorde Battery Corporation 2014...
Страница 235: ...235 LIFELINE AGM BATTERIES Document No 6 0101 Rev F Page 39 of 40 Copyright Concorde Battery Corporation 2014...
Страница 236: ...236 LIFELINE AGM BATTERIES Document No 6 0101 Rev F Page 40 of 40 Copyright Concorde Battery Corporation 2014...
Страница 363: ...363 XANTREX FREEDOM XC PRO INVERTER 1 N L G G L N G L N 2 1 3 4 5...
Страница 364: ...364 XANTREX FREEDOM XC PRO INVERTER N L G G L N G L N 2 1 3 4 5...
Страница 365: ...365 XANTREX FREEDOM XC PRO INVERTER 1 2 3...
Страница 366: ...366 XANTREX FREEDOM XC PRO INVERTER 1 2 3 4 5 7 6...
Страница 367: ...367 XANTREX FREEDOM XC PRO INVERTER...
Страница 369: ...369 XANTREX FREEDOM XC PRO INVERTER sensor cable connector...
Страница 370: ...370 XANTREX FREEDOM XC PRO INVERTER BTS Battery cable neg battery terminal BTS Battery case...
Страница 371: ...371 XANTREX FREEDOM XC PRO INVERTER...
Страница 372: ...372 1 11 13 12 3 5 4 10 8 9 7 6 2 XANTREX FREEDOM XC PRO INVERTER...
Страница 375: ...375 XANTREX FREEDOM XC PRO INVERTER...
Страница 376: ...376 XANTREX FREEDOM XC PRO INVERTER...
Страница 377: ...377 XANTREX FREEDOM XC PRO INVERTER...
Страница 378: ...378 XANTREX FREEDOM XC PRO INVERTER...
Страница 379: ...379 XANTREX FREEDOM XC PRO INVERTER...
Страница 380: ...380 XANTREX FREEDOM XC PRO INVERTER...
Страница 381: ...381 XANTREX FREEDOM XC PRO INVERTER...
Страница 382: ...382 XANTREX FREEDOM XC PRO INVERTER...
Страница 384: ...384 XANTREX FREEDOM XC PRO INVERTER...
Страница 385: ...385 XANTREX FREEDOM XC PRO INVERTER...
Страница 386: ...386 XANTREX FREEDOM XC PRO INVERTER...
Страница 387: ...387 XANTREX FREEDOM XC PRO INVERTER...
Страница 388: ...388 XANTREX FREEDOM XC PRO INVERTER...
Страница 389: ...389 XANTREX FREEDOM XC PRO INVERTER...
Страница 390: ...390 XANTREX FREEDOM XC PRO INVERTER...
Страница 391: ...391 XANTREX FREEDOM XC PRO INVERTER...
Страница 392: ...392 XANTREX FREEDOM XC PRO INVERTER...
Страница 393: ...393 267 288 9 15 290 296 305 0 9 69 336 396 406 0 27 122 125 XANTREX FREEDOM XC PRO INVERTER...
Страница 394: ...394 XANTREX FREEDOM XC PRO INVERTER...
Страница 395: ...395 XANTREX FREEDOM XC PRO INVERTER...
Страница 396: ...396 XANTREX FREEDOM XC PRO INVERTER...
Страница 397: ...397 XANTREX FREEDOM XC PRO INVERTER...
Страница 408: ......
Страница 409: ......