Installing temperature sensor
D055288 ver. 1
1
Temperature sensor
4
Butterfly valve
2
FGR pipe (*)
5
Burner
3
Sleeve (*)
A
Min. 200 mm
Min. 7.87 in
* not included in delivery
3.12 Electrical connections
Connect burner according to the electrical diagrams delivered with burner.
Adhere to general and local standards and regulations as well as requirements set on
the connections of electrical equipment. Configure burner installation with a switch that
allows it to be disconnected from the low-voltage supply mains.
Grounding must be in order before commissioning burner.
See electrical diagram for maximum cable lengths.
Connection to power supply is implemented with two separate supply connections. The
supply of the control circuit of switching device directly to the burner switching base
and supply to the fan motor output are implemented according to the site. The motor
output is cabled both to the fan motor and control circuit to the burner wiring base.
Separate the base insulated wires of different voltage circuits from each other.
32 (129)
M5178 1647EN
Содержание GKP-350 M
Страница 2: ......
Страница 5: ...6 15 Burner part list 129 M5178 1647EN 3 129...
Страница 6: ...4 129 M5178 1647EN...
Страница 18: ...Block diagram of contact links Block diagram ver 5 16 129 M5178 1647EN...
Страница 100: ...5 5 Time sequence diagram gas use Time sequence diagram G ver 3 98 129 M5178 1647EN...
Страница 101: ...Time sequence diagram Gp1 ver 5 M5178 1647EN 99 129...
Страница 132: ...130 129 M5178 1647EN...
Страница 133: ......