Operating instructions and documentation
4.65H/ 4.65 plus
- 35 -
9.6 Connecting the operating unit
The operating unit is not connected by the delivery.
operating unit
emergency switch
The operating unit is not connected when the lift is delivered.
The – conductor bunch is coming from the rail. Put the cable into the bolt
connection at the top of the operating unit.
1. Open the operating unit.
2. Connect the electrical cable (with 7 leads) as following described with
the operating unit:
a. Every lead of the cable has a number on the side. Put the cable
in the numerated part and fasten it.
3. Cable Nr. 6 and Nr. 7 are not needed.
4. Cable Nr. 5 connect it with the press button.
5.
Close the cover.
Содержание 4.65H
Страница 9: ...Operating instructions and documentation 4 65H 4 65 plus 9 2 5 Declaration of conformity ...
Страница 11: ...Operating instructions and documentation 4 65H 4 65 plus 11 3 3 Datasheet ...
Страница 12: ...Operating instructions and documentation 4 65H 4 65 plus 12 ...
Страница 18: ...Operating instructions and documentation 4 65H 4 65 plus 18 3 8 Electrical diagram with wheel free jack ...
Страница 21: ...Operating instructions and documentation 4 65H 4 65 plus 21 Einspeisung supply Bild 2 N L3 L2 L1 PE ...
Страница 36: ...Operating instructions and documentation 4 65H 4 65 plus 36 9 7 Position of the columns ...