Table of Contents
xi
Figure 5-24 Heater Control Window .................................................................................................... 5-22
Figure 5-25 Heater Parameters Window ............................................................................................. 5-22
Figure 5-26 Local Machine Offsets - Heater Offsets ............................................................................ 5-24
Figure 5-27 Input Temperature Offset Value ....................................................................................... 5-24
Figure 5-28 Heater Setup Window - Controlled Process Heat Enabled .............................................. 5-25
Figure 5-29 Heater Control Loop Parameters Window - Main Tab ..................................................... 5-26
Figure 5-30 Heater Control Window - Controlled Process States ....................................................... 5-27
Figure 5-31 Current Air Flow Toolbar .................................................................................................. 5-27
Figure 5-32 Fluidmove Main Window - Cool Down Button .................................................................. 5-28
Figure 5-33 Heater Cool Down Window .............................................................................................. 5-28
Figure 5-34 Adjusting the Impingement Heater Airflow (S2-900P Dual Conveyor) ............................. 5-30
Figure 5-35 Conveyor I/O Test Dialog ................................................................................................. 5-31
Figure 5-36 Pre-Dispense Lift Table Controls ...................................................................................... 5-32
Figure 5-37 Post-Dispense Lift Table Controls .................................................................................... 5-32
Figure 5-38 Dispense Lift Table Controls ............................................................................................ 5-33
Figure 5-39 Beacon Configuration Window ......................................................................................... 5-34
Figure 5-40 Beacon Configuration Window ......................................................................................... 5-35
Figure 5-41 Dispenser I/O Window ...................................................................................................... 5-36
Figure 6-10 Lubricating the Y-Axis Linear Guides ............................................................................... 6-16
Figure 6-11 Tensioning the Cables ...................................................................................................... 6-17
Figure 6-12 Tensioning the Z-Axis Cables ........................................................................................... 6-18
Figure 6-13 Accessing the Linear Encoder .......................................................................................... 6-19
Figure 6-14 X-Axis Encoder Read Head Mounting Screws ................................................................. 6-20
Figure 6-15 Y-Axis Encoder Bracket .................................................................................................... 6-21
Figure 6-16 Adjusting the Y-Axis Linear Encoder Gap ........................................................................ 6-22
Figure 6-17 Adjusting the Linear Encoder Height ................................................................................ 6-23
Figure 6-18 Tensioning the Conveyor Belts ......................................................................................... 6-25
Figure 8-10 PDHC Fuse Location ........................................................................................................ 8-13
Figure 8-11 Replacing a Panel-Mounted Fuse .................................................................................... 8-15
Содержание Spectrum II S2-900 C Series
Страница 2: ......
Страница 34: ...1 20 Introduction 1 11 7 Rear View Figure 1 8A S2 900 Rear View 30A Power Manager shown 1 2 3 4 5 7 6...
Страница 36: ...1 22 Introduction 1 11 8 Rear View Open Figure 1 9A S2 900 Rear View Open 1 2 3 4...
Страница 40: ......
Страница 124: ......
Страница 157: ...Calibration and Adjustment 5 33 Figure 5 38 Dispense Lift Table Controls...
Страница 159: ...Calibration and Adjustment 5 35 Figure 5 40 Beacon Configuration Window...
Страница 186: ......
Страница 197: ...Troubleshooting 7 11 Figure 7 1 Scale Setup Menu Figure 7 2 Scale Error Message...
Страница 200: ......
Страница 215: ...Parts Replacement 8 15 Figure 8 11 Replacing a Panel Mounted Fuse...
Страница 218: ......
Страница 223: ...Specifications 9 5 Top View mm Back View mm Figure 9 2 S2 900 System Dimensions 2 of 2...
Страница 225: ...Specifications 9 7 Top View mm Back View mm Figure 9 4 S2 9XXC System Dimensions 2 of 2...
Страница 228: ...A 2 Appendix A Material Safety Information A 2 1 Multemps PS NO 2...
Страница 229: ...Appendix A Material Safety Information A 3...
Страница 230: ...A 4 Appendix A Material Safety Information...
Страница 231: ...Appendix A Material Safety Information A 5...
Страница 232: ...A 6 Appendix A Material Safety Information...
Страница 233: ...Appendix A Material Safety Information A 7...
Страница 234: ...A 8 Appendix A Material Safety Information A 2 2 Moly Graph Extreme Pressure Multi Purpose Grease...
Страница 235: ...Appendix A Material Safety Information A 9...
Страница 236: ...A 10 Appendix A Material Safety Information...
Страница 237: ...Appendix A Material Safety Information A 11...
Страница 238: ...A 12 Appendix A Material Safety Information...
Страница 239: ...Appendix A Material Safety Information A 13...
Страница 240: ...A 14 Appendix A Material Safety Information...
Страница 246: ......
Страница 252: ......
Страница 258: ......