Sdasdasdsdfdsdcdscsdcdcd
cdcsc
13
Nitronic AG
Mattenstrasse 11
2555 Bruegg
Email: [email protected]
Switzerland
Phone: +41 32 373 70 70
Screw on nut
(18)
and tighten up
Fig. 17
.
Fig. 17
Fig. 18
Insert the two keys
(22)
and install the previously-greased O-ring
(20)
Fig.
18
.
The two keys
(22)
must be inserted flush with the inside diameter of the slot.
Push centering scale
(17)
with a slight turning movement to the stop but do not yet tighten screw
(19)
(black)
Fig. 19
.
Fig. 19
If the centering scale
(17)
cannot be pushed over the O-ring the two keys
(22)
are not properly.
The centering device must now be calibrated in the next operating step.
22
18
19