Height Rider/SP Series
Operating & Safety Instructions
English/USA – 01/18
Original instructions
14
3
Preparation and Inspection
3.1
UNPACKING
Since the manufacturer has no direct control over the shipping or carriage of any Niftylift it is the
responsibility of the dealer and/or owner and/or lessee to ensure the Niftylift has not been damaged in
transit and a Pre-operational Report has been carried out by a qualified engineer before the aerial
platform is put into service.
1)
Remove all ropes, straps, and or chains used to secure the aerial platform during transit.
2)
Ensure any ramp, loading dock or forklift used is capable of supporting or lifting the aerial platform.
3)
If the aerial platform is to be driven off, please ensure that the operator has read and fully
understood this entire manual. Refer to the appropriate section for precise operating instructions.
**Carry out the Pre-operational Report (Refer to Section 6.3) before placing machine in
service.
3.2
PREPARATION FOR USE
Whilst every effort has been made at the Niftylift factory to ensure your machine arrives in a safe and
operable condition it is necessary to carry out a systematic inspection prior to putting the aerial
platform into service.
THIS IS NOT A REQUEST IT IS MANDATORY
To assist the user in this task you will find enclosed a Pre-operational Report, which must be filled out
upon delivery/receipt of the machine.
Before the user carries out the Pre-operational Report he must have read and fully understood all the
contents of the Operating, Safety and Maintenance Manual.
WARNING - DO NOT OPERATE A POTENTIALLY DEFECTIVE OR
MALFUNCTIONING MACHINE. CORRECT AND REPAIR ANY DEFECTS BEFORE
OPERATING YOUR NIFTYLIFT.
MACHINE STABILITY
- The machine requires battery mass for stabilisation. If the
batteries or any other significant component have been removed,
the machine will
be unstable
. Contact Niftylift, UK before removal or replacement of any significant
component.
Содержание HR 12
Страница 77: ......